Laserfiche WebLink
c <br /> O O CITY OF ORONO <br /> a <br /> et,,, Municipal Offices <br /> a � �„��� s I A, Street Address Mailing Address: <br /> '� "'��q,`,,l k G'� 2750 Kelley Parkway P.O.Box 66 <br /> �9 0' �� �� • <br /> Orono,MN 55356 Crystal Bay,MN 55323-0066 <br /> kESHO�' <br /> To: The Current Owner of Address 680 ORCHARD PARK RD <br /> City Ordinance requires that onsite sewage treatment systems in Orono be inspected on a <br /> periodic basis. The onsite sewage treatment system at the above address has been inspected and <br /> the following is known about the system. A sketch of the known components of the system is <br /> available for most properties at the Orono City Hall. <br /> Imminent Public Healt hreat <br /> Yes <br /> No <br /> If yes, please contact the Onsite Systems Manager at 954-249-4626 within 10 days of receipt of <br /> this notice. The septic system must be brought into compliance within 90 days. Failure to do so <br /> will result in referral to the City Attorney for legal action. <br /> System Identified a on-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 t. <br /> Other <br /> Septic Tank(s) Pump o Needed <br /> Yes <br /> No <br /> The city recommends the septic tank(s) and/or lift tank be serviced and pumped out every three <br /> (3) years. City records indicate the tank(s)were last pumped out on ( (- d(p . <br /> The tank(s) should be cleaned through the manhole and not through the inspection pipes, this <br /> allows for proper cleaning. <br /> Comments: <br /> Inspeezj 1. g 3! Date of Inspection: ‘ -6-7 <br /> Telephone (952) 249-4600 • Fax (952) 249-4616 <br /> www.ci.orono.mn.us <br />