My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00159 - septic
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
665 Orchard Park Road - 31-118-23-11-0005
>
Septic
>
2013-00159 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:28:25 PM
Creation date
4/30/2018 3:15:17 PM
Metadata
Fields
Template:
x Address Old
House Number
665
Street Name
Orchard Park
Street Type
Road
Address
665 Orchard Park Road
Document Type
Septic
PIN
3111823110005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> UNIVERSITY f ` <br /> Minnesota Pollution Design Worksheet OF MINNESOTA <br /> Control Agency 4L�•.. <br /> Project ID: v 11 <br /> 1. Select Number of Perforated Laterals in system/zone: 3 --_ <br /> (2 feet is minimum and 3 feet is maximum spacing) <br /> insulated.o:o s o. <br /> :: �r 7 <br /> 2. Select Perforation Spadng: 3.0 ft '2 12'Soil rover '` ; I <br /> GPot...We t <br /> ini /� <br /> V."pertorati°rn spared 3'span I 1M"•2"mowf n rock J 11' • <br /> 3. Select Perforation Diameter Size 7/32 in _ <br /> 16 of rock <br /> 4. Length of Laterals =Media Bed Length-2 Feet. perforation sizing:•f."to V1." perforation spacing:2'to 3' <br /> 63 - 2ft = 61 ft Perforation can not be closer then 1 foot from edge. <br /> 5. Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spadng (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft 3 ft = 20 Spaces <br /> 6. Number of Perforations per Lateral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Lateral = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check table below to verify the number of perforations per lateral guarantees less than a 10%discharge variation. The value is <br /> double if the a center manifold is used. <br /> Maximum Number of Perforations Per Lateral to Guarantee<10%Discharge Variation <br /> '/,Inch Perforations 7/32 Inch Perforations <br /> Perforation Spacing(Feet) PipeDiameter(Inches) Perforation Spacing Pipe Diameter(Inches) <br /> 1 114 111 2 3 (Feet) 1 134 131 2 3 <br /> 2 10 13 18 30 60 2 11 ' 16 21 34 68 <br /> 211 8 12 16 28 54 261 10 14 20 32 64 <br /> 3 8 12 16 25 52 3 9 14 19 30 60 <br /> 3/16 Inch Perforations 1/8 Inch Perforations <br /> Perforation Spacing(Feet) PipeDiameter(Inches) Perforation Spacing Pipe Diameter(Inches) <br /> 1 164 lit 2 3 (Feet) 1 136 111 2 3 <br /> 2 12 18 26 46 87 2 21 33 44 74 149 <br /> 211 12 17 24 40 80 211 20 30 41 69 135 <br /> 3 12 16 22 37 75 3 20 29 38 64 128 <br /> 7. Total Number of Perforations equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X 3 Number of Perf. Laterals = 63 Total Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended value is 4-10 ft 2 per perforation. Perforation DhGw0e(6111) <br /> Does not apply to At-Grades ,d thr Perforation Diameter <br /> Bed Area = Bed Width(ft)X Bed Length(ft) <br /> 1.w o.1e o.a os6 0.2� <br /> 1.5 0.22 0.51 0.69 0.9 <br /> 10 ft X 63 ft = 630 ft2 2.0• 0.26 0.59 0.80 1.04 <br /> 2.5 0.29 0.65 0.89 1.17 <br /> 3.0 0.32 0.72 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of Perforations (Line 7). 4.0 0.22 0.83 ,.1133 1.47 <br /> 5.0 0.41 0.93 1.26 1.65 <br /> Dwellings wi <br /> 630 ft' .r. 63 perforations = 10.0 ft2/perforations "wt perforations 3/16 inch to l/41Kh <br /> Disellfngr with Ill inch perforetlws <br /> 2 feet Other establishments end MSTS with 3116 <br /> 9. Select Minimum Average Head: 1.0 ft Inch to 114 inch perforations <br /> s feet Other establishments and MST'with Minch <br /> perforations <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11. Determine required Flow Rate by multiplying the Total Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br />
The URL can be used to link to this page
Your browser does not support the video tag.