My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00159 - septic
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
665 Orchard Park Road - 31-118-23-11-0005
>
Septic
>
2013-00159 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:28:25 PM
Creation date
4/30/2018 3:15:17 PM
Metadata
Fields
Template:
x Address Old
House Number
665
Street Name
Orchard Park
Street Type
Road
Address
665 Orchard Park Road
Document Type
Septic
PIN
3111823110005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Non-Level Pressure Distribution UNIVERSITY <br /> Minnesota Pollution Design Worksheet OFMINNESOTA ' <br /> Control Agency x`'' 'L\� <br /> Lateral 4 GPM=Length of Lateral X Gallons Per Minute Per Foot(Line 8) <br /> 30 ft X 0.30 GPM/Ft= 9.0 GPM <br /> Number of Perforations=GPM/Flaw Rate for Lateral 4(Line 6.4) Check Table to ensure the maximum number of perforations is not <br /> exceeded. <br /> 9.0 + 0.87 = 10 Perforations Select Type of Manifold Connection(End or Center): <br /> Spacing=(Length of Lateral)/(Number of Perforations-1) 0 ceraa <br /> ( 30 ) + ( 10 Perforations-1) = 3.2 ft = 38.59 inches <br /> Lateral 5 GPM=Length of Lateral X Gallons Per Minute Per Foot(Line 8) <br /> 30 ft X 0.30 GPM/Ft= 9.0 GPM <br /> Check Table to ensure the maximum number of perforations is not <br /> Number of Perforations=GPM/Flow Rate for Lateral 5(Line 6.5) exceeded <br /> 9.0 + 0.87 10 Perforations Select Type of Manifold Connection(End or Center): <br /> El <br /> Spacing=(Length of Lateral)/(Number of Perforations-1) End 0 Cenci <br /> ( 30 ) + ( 10 Perforations-1) = 3.2 ft = 38.59 inches <br /> Lateral 6 GPM=Length of Lateral X Gallons Per Minute Per Foot(Line 8) <br /> 30 ft X 0.30 GPM/Ft= 9.0 GPM <br /> Number of Perforations=GPM/Flow Rate for Lateral 6(Line 6.6) Check Table to ensure the maximum number of perforations is not <br /> exceeded. <br /> 9.0 0.87 = 10 Perforations Select Type of Manifold Connection(End or Center): <br /> Spacing=(Length of Lateral)/(Number of Perforations-1) 0 End 0 Cella <br /> ( 30 ) + ( 10 Perforation-1) = 3.2 ft = 38.59 inches <br /> 10. Calculate Total GPM for system-the total GPM need from the pump. <br /> Lateral 1 Flow+Lateral 2 Flow+Lateral 3 Flow+Lateral 4 Flow+Lateral 5 Row+Lateral 6 Flow <br /> 9.0 + 9.0 + 9.0 + 9.0 + 9.0 + 9.0 = 54.2 Total GPM <br /> 11. Summary <br /> Enter the minimum pipe size that allows for even distribution and the volume of liquid in the pipe from Volume of Liquid in <br /> the table. Pipe <br /> Total Volume Pipe Liquid <br /> Pipe Volume Pipe Length to Fill Pipe Perforation Diameter Per Foot <br /> Pipe Size(in) (gal/ft) (ft) (gal) Size(in) Spacing(ft) (inches) (Gallons) <br /> lateral 1 1.5 0.110 30 3.3 7/32 2.0 Highest 1 0.045 <br /> Lateral 2 1.5 0.110 30 3.3 7/32 2.0 1.25 0.078 <br /> lateral 3 1.5 0.110 30 3.3 7/32 2.0 1.5 0.110 <br /> Lateral4 1.5 0.110 30 3.3 7/32 3.2 3 0.380 <br /> 3 0.380 <br /> Laterals 1.5 0.110 30 3.3 7/32 3.2 4 0.661 <br /> Lateral6 1.5 0.110 30 3.3 7/32 3.2 Lowest <br /> Total Volume of Distribution Piping= 19.8 <br /> Min.Delivered Dose Volume=Four X the Total Volume of Piping= 79.2 <br /> Comments/Special Design Considerations: <br />
The URL can be used to link to this page
Your browser does not support the video tag.