My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00101 - demo
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
665 Orchard Park Road - 31-118-23-11-0005
>
Permits/Inspections
>
2013-00101 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:28:24 PM
Creation date
4/30/2018 3:13:48 PM
Metadata
Fields
Template:
x Address Old
House Number
665
Street Name
Orchard Park
Street Type
Road
Address
665 Orchard Park Road
Document Type
Permits/Inspections
PIN
3111823110005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Keep all demolition debris off adjoining property and/or the public rights-of way unless specific ' <br /> prior approval is obtained in writing for temporary use thereof. <br /> 6. Completely remove foundation(s)from the ground. <br /> 7. Completely dispose of all demolition debris off site in accordance with all applicable PCA <br /> requirements. <br /> 8. Abandon water wells in accordance with State Health Department regulations. <br /> 9. Call for an inspection when all debris has been removed, before backfilling. <br /> 10. Within 5 working days of superstructure removal, a final inspection shall be requested. The site <br /> shall be left clean and clear of all debris, with any excavation filled with earth level with the <br /> adjacent ground elevation (except when such excavation is to be used as part of a new building <br /> and such new building is actually under construction). <br /> 11. Abandon septic systems per Minnesota Rules Chapter 7080. All septic tanks must be pumped, <br /> crushed and filled with native soils. An inspection is required after the tanks are pumped and <br /> before the tanks are crushed and filled. <br /> 12. The undersigned owner shall and hereby does indemnify and hold harmless the City of Orono, <br /> its agents, employees and assigns from and against all claims, damages, losses or expenses, <br /> including attorney fees, against the City, its agents, employees and assigns arising out of or <br /> resulting from the demolition described herein as performed by the property owner, his <br /> employees, agents, subcontractors or assigns. <br /> PERMIT TYPE AND FEE CALCULATION <br /> `I $75.00 — Principal Structure /T $ 1S <br /> 2-$50.00 — Accessory Structure x` 2, (how many) / <br /> 00 <br /> 1. Subtotal of above permit'regtre'sted $ <br /> 2. State Surcharge 5.00 <br /> 3. TOTAL PERMIT FEE (add lines 1-2 above) $ C 0D <br /> tea— <br /> The undersigned herby applies to the City of Orono for issuance of a Demolition Permit, agrees to do <br /> all the work in a strict accordance with the ordinances of the City and the regulations of the State of <br /> Minnesota, and certifies that all statements made on this application are complete, true and correct. <br /> Applicant's Signature: Date: 2// <br /> Owner's Signature: Date: //// <br /> Approved By: Date: 2- Z. 0 -- 13 <br /> -(S)B ding Official) <br /> r �✓vw� <br /> *Zoning Disclosure Required? DYES ❑ NO +tAP " Wt,(71_471fiki,MAl <br /> "This must be filled out byZoning i-pa = t—F• - her answer, a Zoning Offt sign alI applications. <br /> * ii <br /> Approved By: / Date: �� (� <br /> (Zoning Official) <br />
The URL can be used to link to this page
Your browser does not support the video tag.