Laserfiche WebLink
640 Orchard Park Rd. <br /> Orono <br /> (2) <br /> Approval will be needed to be 10 ' from the toe of the mound to the <br /> property line . <br /> The absorption area is 82 ' from the existing well . The toe of the <br /> mound is 70 ' from the well which meets city codes . <br /> This site has an existing failing system due to strong clay soils <br /> with a high seasonally high water table , the existing tank is deep <br /> & old & will need to be abandoned, pumped & filled with soil . <br /> Keep all heavy equipment off of the proposed treatment area before <br /> and after construction . The treatment area should be marked off <br /> before construction. This Design is not valid & the system will <br /> need to be relocated if failure to protect the areas proposed <br /> for On-Site Sewage Treatment occurs . <br /> With proper installation and maintenance , this system should have <br /> no problem in treating septic effluent effectively. <br /> Nothing other than gray water (laundry, showers , etc . ) human waste <br /> & toilet tissue should be disposed into the septic tanks . Garbage <br /> disposals are not recommended . Excessive amounts of soaps , cleaning <br /> agents & chlorine agents may kill the bacteria needed to treat <br /> septic effluent. Additives are not recommended. Recommend to pump <br /> & clean your tank through the manhole by a certified pumper every <br /> year if you have 1 tank and every 2 years if you have two tanks . <br /> Steven B. Schirmers <br /> SBS/ds <br />