My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01180 - new structure
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
585 Orchard Park Road - 31-118-23-14-0001
>
Permits/Inspections
>
2016-01180 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:21 PM
Creation date
4/27/2018 2:41:09 PM
Metadata
Fields
Template:
x Address Old
House Number
585
Street Name
Orchard Park
Street Type
Road
Address
585 Orchard Park Road
Document Type
Permits/Inspections
PIN
3111823140001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7 <br /> 0°340 J CITY of ORONO <br /> '�� #r .1 Municipal Offices <br /> Street Address: Mailing Address: <br /> ‘*,11QA's.4)6*' <br /> 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> June 28, 1995 <br /> Donnell and Henrieta Thomas <br /> 585 Orchard Park Road <br /> Long Lake, Minnesota 55356 <br /> The Orono staff has recently completed an inspection of the local watershed of your <br /> neighborhood. The inspection resulted from concerns raised by the owner of the property <br /> located at 665 Orchard Park Road advising of severe flooding problems on their property. Refer <br /> to the drainage map enclosed, drainage runs from the north to the south through the rear yard <br /> of your property to a culvert beneath the driveway at the Weestrand property located at 525 <br /> Orchard Park Road eventually to the wetland. <br /> The engineer noted recent filling on your property that has restricted the historic and natural <br /> flow of drainage through your property causing major flooding problems for the Pidgeon <br /> property to the north. Restricting or blocking the flow of natural drainage is in violation of State <br /> statute. We must ask that you contact the City offices so that we may arrange to meet with you <br /> and the City Engineer in order to quickly resolve the flooding problems of your neighbor and <br /> remove the violation. <br /> You are asked to contact my office no later than Monday, July 10th so that we can arrange to <br /> meet at the City offices to determine the best method of restoring drainage for the watershed. <br /> If you have any questions pertaining to this matter, please feel free to contact my office. <br /> Sincerely, <br /> Jeanne A. Mabusth <br /> Building & Zoning Administrator <br /> JAM/ch <br /> cc: Shawn Gustafson, City Engineer • <br /> Harlan Olson, Field Engineer <br /> John R. Gerhardson, Public Works Director <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.