Laserfiche WebLink
icoIv, <br /> CITY OF ORONO <br /> Street Address: Mailing Address: Telephone(952)249-4600 <br /> 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616 <br /> 4 Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> kESHO� <br /> October 6,2016 <br /> TJB Homes, Inc. <br /> 9100 Baltimore Street NE#102 <br /> Blaine, MN 55449 <br /> Re: Building Permit Application#2016-01180 <br /> 585 Orchard Park Road <br /> On September 23, 2016 the City received a building permit application for a new single family home. Staff conducted <br /> a preliminary review based on the information provided and recommends the following items be submitted or revised <br /> in order for your application to be considered complete and for the plan review to continue: <br /> 1. Certificate of Survey. Our engineer has reviewed the survey and has the following comments: <br /> a. The construction entrance depicted should be a rock construction entrance and the roadway kept clear <br /> of debris. <br /> b. The existing driveway is shown however doesn't match up with the proposed house. Please clarify. <br /> 02. Landscape Plan. Prior to the issuance of the building permit a landscape plan must be submitted showing all <br /> • the proposed exterior/landscaping improvements,i.e.patios,grading,sidewalks,retaining walls,etc. The plan <br /> 50114should include the name of the individual performing the work. Any proposed patios, grading, sidewalks, <br /> retaining walls shown on the landscape plan should also be reflected on the survey. <br /> 3. Escrow& Escrow Agreement. We acknowledge the receipt of$2,500 from TJB Homes, Inc. for the building <br /> permit escrow, but be aware per the City's policy the money will be refunded to the property owner. <br /> 4. Septic. An incomplete septic design was submitted. Our Building Official/Septic Specialist has been <br /> unsuccessful in connecting with your septic designer. An alternate septic site must be identified including <br /> borings and perc tests, and shown on the survey; the sites should be protected during construction. Please <br /> provide the information as soon as possible for our review. <br /> 5. Agreement for Removal of Existing Principal Structure.Two principal structures are not permitted on a single <br /> property. In order for the existing home to be used as a dwelling until the completion of the new residence, <br /> the City requires that the property owner(s) enter into an agreement of understanding. The existing home <br /> must be removed prior to the issuance of the final Certificate of Occupancy for the new home. A temporary <br /> Certificate of Occupancy will be necessary as the demolition of the existing home and the finalization of the <br /> landscaping will be required prior to a final CO. Please note there is$10,000 escrow required in conjunction <br /> with a temporary CO. <br /> The City's Attorney will prepare the Agreement which will allow the existing principal structure to remain until <br /> the new principal structure has been constructed and completed. In order to be enforceable this Agreement <br /> will be recorded against the property; please proved the full legal name and marital status for all property <br /> owner(s). <br />