My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01419 - septic
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
585 Orchard Park Road - 31-118-23-14-0001
>
Septic
>
2016-01419 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:21 PM
Creation date
4/27/2018 2:40:57 PM
Metadata
Fields
Template:
x Address Old
House Number
585
Street Name
Orchard Park
Street Type
Road
Address
585 Orchard Park Road
Document Type
Septic
PIN
3111823140001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13-16 u SECTION 13: Forms and Reference <br /> • <br /> OSTP Design Summary Worksheet UNIVERSrTY Minnesota Pollution <br /> ' - - <br /> Control Agency OF MINNESOTA i;y; .. <br /> Property Owner/Client: 77.1 j5 a Nile- Project ID: v 11.10.10 <br /> Site Address: Sr Mer3447— ClA fd., <br /> 1. AVERAGE DESIGN FLOW: <br /> A. Design Flow: 9 OOP Gallons Per Day(GPD) Note: The estimated design flow is considered a peak flow rate including a safety <br /> factor.For long term performance,the overage dally flow is recommended to be< <br /> B. Septic Tank capacity: 7.. poop Gallons 60%of this value. . ._ <br /> C. Number of Septic Tanks or Compartments: S Effluent Screen&Alarm? 04 , <br /> Type of Soil Treatment and Dispersal Area* Type of Distribution* <br /> O Trenches 0 Bed O At.Qade <br /> 0 Gravity Distribution diff)Pressure D union-teed 0 Pressure Distrbuaon-Unkvd <br /> Otherl r <br /> O Drip Dish@. 0 Holding Tank 0 <br /> •Selection Required Benchmark Elev- ft • <br /> System Type Benchmark Location: ,trisneser <br /> T ype I 0 Type ti ['Type III ['Type iV [(Type V <br /> Type of Distribution Media: <br /> D. Pump Tank f Capacity: /Sop Gallons Pump Tank 2 Capacity: Gallons <br /> 2. SiTE EVALUATION: ' <br /> A. . Depth to Limiting Layer: 2.4 inches [ ]ft Elevation li Location of Limiting Layer: 1 ivas,4 ift <br /> B. Measured Percent Land Slope: ( I E- % 0.0 Location: 0_1&:,,,,,...4 Z k, <br /> C. . Soil Texture: joike,.1/ S/t.7`f CEPPO Perc Rate: 6-m MPI <br /> D. Soil Hydraulic Loading Rate: a ')a GPD/ft2 E.Contour Loading Rate Gat/ft <br /> 3. DESIGN SUMMARY <br /> Trench Design Summary <br /> Dispersal Area ft2 Sidewall Depth . in Trench Width in <br /> Total Lineal Feet ft Number of Trenches Maximum Trench Depth in <br /> Designer's Max Trench Depth in <br /> Bed Design Summary - <br /> Absorption Area ft2 Media Below Pipe In Bed Length ft <br /> Bed Width .' <br /> ft Maximum Bed Depth - in Designers Max Bed Depth in s <br /> Mound Design Summary <br /> Absorption Area Mall ft2 Bed Length ?S ft Bed Width /d ft <br /> Absorption Width /S ft Clean Sand Lift 1. 0 ft Berm Width (slope 0-1%) ft <br /> Upslope Berm Width 9 ft Downslope Berm Width 30. ft Endslope Berm Width /J ft <br /> Total System Length 91 * ft Total System Width 4 ft • <br /> At-Grade Design Summary <br /> Absorption Bed Width ft Absorption Bed Length ft System Height ft <br /> Absorption Bed Area ft2 Upslope Berm Width ft Downslope Berm Width ( Ift <br /> Endslope Berm Width ft System Length ft System Width ft <br /> • <br /> 09/11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.