My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P09113 - new septic system
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
525 Orchard Park Road - 31-118-23-14-0002
>
Septic
>
2005-P09113 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:24 PM
Creation date
4/27/2018 1:51:25 PM
Metadata
Fields
Template:
x Address Old
House Number
525
Street Name
Orchard Park
Street Type
Road
Address
525 Orchard Park Road
Document Type
Septic
PIN
3111823140002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
View images
View plain text
• <br /> PUMP SELECTION PROCEDURE <br /> All boxed rectangles must be entered,the rest will be calculated. <br /> 1. Determine pump capacity: <br /> A. Gravity Distribution <br /> 1.Minimum required discharge is 10 gpm <br /> 2. Maximum suggested discharge is 45 gpm <br /> For other establishments at least 10%greater than the water <br /> supply rate,but no faster than the rate at which effluent will flow <br /> out of the distribution device. <br /> B. Pressure Distribution-see pressure design worksheet leato nt hstem <br /> &pt' acarge <br /> Ott <br /> Selected Pump Capacity: 29 gpm total pipe <br /> length <br /> 2A.elevation <br /> Inlet • ' difference <br /> 2. Determine head requirements: PPG FSI <br /> A. Elevation difference between pump and point of discharge. i <br /> 8 feet <br /> mnrrf+»r3++rr <br /> B. Special head requirement?(See Figure-Special Head Requirements) <br /> 5 feet Special Head Requirements <br /> Gravity Distribution Oft <br /> C. Friction loss Pressure Distribution 5ft <br /> 1. Select pipe diameter 2 in <br /> 2. Enter Figure E-9 with gpm(1A or B)and pipe diameter(C1) <br /> Read friction loss in feet per 100 feet from Figure E-9 E-9 Friction Loss in Plastic Pipe <br /> Friction loss= ( 1.55 ft/100 ft of pipe per 100 ft <br /> nominal <br /> 3.Determine total pipe length from pump discharge to soil system discharge point. Flow Rate pipe diameter <br /> Estimate by adding 25 percent to pipe length for fitting loss. gpm 1.5" 2.0" 3" <br /> E•uivalent • • length times 1.25=total pipe length 20 2.47 0.73 0.11 <br /> 25 ft x 1.25= 31.25 feet 25 3.73 1.11 0.16 <br /> 30 5.23 1.55 0.23 <br /> 4.Calculate total friction loss by multiplying friction loss(C2) 35 6.96 2.06 0.3 <br /> by the equivalent pipe length(C3)and divide by 100. 40 8.91 2.64 0.39 <br /> FL= 1.55 ft/100ft X 31.25 ft / 100. 1.0 feet 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> D. Total head requirement is the sum of elevation difference(A),special 55 4.76 0.7 <br /> head requirements(B),and total friction loss(C4). 60 5.6 0.82 <br /> 8 ft + 5 ft + 1.0 ft 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> Total Head: 14.0 feet <br /> 3. Pump Selection <br /> 1.A pump must be selected to deliver at least 29 gpm(1A or B) <br /> with at least 14.0 feet of total head(2D). <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances,rules and laws. <br /> (signature) 810 (license#) 5//7/v3 (date) <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).