My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
525 Orchard Park Road - 31-118-23-14-0002
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:25 PM
Creation date
4/27/2018 1:43:27 PM
Metadata
Fields
Template:
x Address Old
House Number
525
Street Name
Orchard Park
Street Type
Road
Address
525 Orchard Park Road
Document Type
Septic
PIN
3111823140002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 -I; °- 1 :1 <br /> _).,-,-;_'. 4'''- CITY of ORONO <br /> 114*<1.4.�+4i►- / Street Address: Municipal Offices <br /> Mailing Address: <br /> 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> October 21,2002 <br /> RANDALL J WEESTRAND <br /> 525 ORCHARD PARK RD <br /> LONG LAKE MN 55356 <br /> Dear Mr. Weestrand: <br /> This letter is regarding the failing septic system on your property. After several inspections in <br /> the past and an inspection performed last week, it appears that your septic system is still <br /> surfacing and classified as an imminent health risk that must be replaced next spring, 2003. I <br /> sent you a letter on 8-22-01 that your drainfield was surfacing and must be replaced by 8-22-02. <br /> That date has come and gone and the drainfield is still surfacing. If I do not hear from you by <br /> November 1, 2002 on how you are going to proceed with this issue I will forward this case to our <br /> attorney. We need you to get a designer to design a new drainfield for you this winter so you can <br /> install a new one next spring. A failing septic system is a hazard to your family,pets and to <br /> your neighbors. <br /> Efforts must be made immediately to stop the surfacing of raw sewage on the surface of the <br /> ' ground until a new drainfield is installed. One temporary option to get you through this winter is <br /> to use your septic tanks as holding tanks. The tanks would be pumped until a new drainfield is <br /> installed next spring. This would stop sewage from going into your drain field and surfacing on <br /> the ground. <br /> Please contact me at 952-249-4600 to discuss this matter further so we can get this problem taken <br /> care of as soon as possible. <br /> Sincerely, <br /> Ckficitic iiirj <br /> Matt Bolterman <br /> On-Site Septic System Manager <br /> End: Past violation notice <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.