My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
480 Orchard Park Road - 32-118-23-23-0010
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:43 PM
Creation date
4/25/2018 1:08:37 PM
Metadata
Fields
Template:
x Address Old
House Number
480
Street Name
Orchard Park
Street Type
Road
Address
480 Orchard Park Road
Document Type
Septic
PIN
3211823230010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/21/2007 01:16 7634975011 SPTESTINGINC PAGE 03/03 <br /> SCHIRMERS WASTEWATER TREATMENT SYSTEMS,6INC: <br /> Steven B. Schirmers • 951 Katydid Lane NE • St. Michael, MN 5 <br /> Cert.No.627 • (763) 497-3566 • FAX (763) 497-5011 State License#395 <br /> www.mnmultiflo.com - wwwmultifio.com <br /> SERVICESSINTRAPI_APTHORIZATIOREOMMIDLOICLE <br /> December 27, 2006 <br /> Ross & Maria Lang 952-473-5264 <br /> 480 Orchard Park Rd. <br /> Orono, MN 55356 <br /> This contract will be in effect from January 1, 2007 through <br /> December <br /> erM31, 20 System. <br /> 007 at a <br /> cost of$150.00. The contract will include 2 inspectionug <br /> LHS ECT_LOILC.,A,LLS NI .1ttCJ 5!LD_E. <br /> 1. An effluent quality inspection consisting of a visual check for color and an <br /> examination for odors. <br /> 2. Inspection and adjustment of manufacturer's mechanical and electrical <br /> components as needed. <br /> 3. Sampling of the settable solids in the aeration tank to determine proper tank <br /> pumping frequency (at least once per year). <br /> 4. Examination of the surge bowl gaskets to determine the condition. <br /> 5. Vacuuming of weir and fitters as needed. <br /> 6. Making recommendation to unit owner regarding problem areas. <br /> 7. Pumping out the unit 1 every 2 years -there will be an extra charge if pumping is <br /> needed more than 1 time every 2 years. <br /> Additional service calls will be made for valid reasons. This contract includes labor for <br /> replacement of Multi-Flo factory components as follows: (Does not include misuse, <br /> storm damage etc.) <br /> Motor Aerator Unit- Filters - Pressure Sensors &Alarm System <br /> Additional service will be provided upon written authority from customer at an additional <br /> cost. These services would include but not be limited to pumping or cleaning of tank or <br /> pretank, filters (new or reconditioned) and other manufacturer's component parts. <br /> Please sign and return this contract along with your payment upon receipt and keep a <br /> copy for your records. <br /> Thank You <br /> Signature Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.