Laserfiche WebLink
23) 0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br /> (this must match the soil boring log) desired mound ratio 2.7 <br /> 24) 5 percent site slope (0-20%range) 5 (%downslope site slope, if different than upslope) <br /> 25) 18 inches, or 1.5 ft. to Redox or other limiting condition (need at least 12"to be a Type I) <br /> Treatment zone contains 0 inches of 0%soil credit, and 0 inches of 50%soil credit. Giving a: <br /> 26) 18 Inch, or 1.5 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br /> 27) 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br /> 28) 0.0 ft. upslope and sideslope <br /> 17.0 ft. Downslope <br /> Individual slope ratios give BERM widths(topsoil beyond rockbed)of: <br /> 29) 4:1 upslope ratio 12 ft. upslope berm <br /> 30) 4:1 sideslope 16 ft. sideslope berms <br /> 31) 4:1 downslope 21 ft. downslope berm <br /> 32) Overall Dimensions: 10.0 ft.wide by 50.0 ft. long Rock bed <br /> 43 ft. wide by 82 ft. tong Mound footprint <br /> T4" inspection pipe <br /> 18" cover on top <br /> Upslope berm 12 Downslope berm 21 <br /> 12" cover on sides <br /> re - (6"'Garay cap do 6"topsoil) <br /> 1.5 Clean sand lift <br /> _ 1.5 DF�ptt=: <<) Unlit Ink; <br /> Limit iflo condition <br /> Absorption Width ( 27.0 ( - -- - <br /> y <br /> Note: <br /> For 0 to 1%slopes, Absorption Width is measured from the Bedequaily in both directions. <br /> For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed. <br /> 33) Rock Bed: <br /> 10.0 ft. by 50.0 ft. by 6 inches under pipe, plus 20%gives 17 yd'or•1.4= 24 ton <br /> 34) Mound Sand: (note:volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br /> 28.5 up + 61.7 downslope + 13.3 ends+ 32.4 under rock= 163 yd'or•1.4= 228 ton <br /> plus 20% <br /> 35) Loamy Cap: <br /> 39 ft. by 78 ft. 6"deep, plus 20%gives 68 yd'or 1.4= 95 ton <br /> 36) Topsoil: <br /> 43 ft. by 82 ft. 6"deep, plus 20%gives 79 yd'or•1.4= 111 ton <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> Rusty olson's Soil&Perc 810 9/1/2016 <br /> igner Signature Company License# Date <br />