My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01201 - new structure
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
460 Orchard Park Road - 32-118-23-23-0012
>
Permits/Inspections
>
2016-01201 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:46 PM
Creation date
4/25/2018 11:25:37 AM
Metadata
Fields
Template:
x Address Old
House Number
460
Street Name
Orchard Park
Street Type
Road
Address
460 Orchard Park Road
Document Type
Permits/Inspections
PIN
3211823230012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> BOLTON 2638 Shadow Lane <br /> IC Suite 272 <br /> & M E N <br /> Chaska, MN 55318-1172 <br /> Real People.Real Solutions. Ph: (952)448-8838 <br /> Fax: (952)448-8805 <br /> Bolton-Menk.com <br /> October 10, 2016 <br /> City of Orono <br /> Attn: Christine Mattson <br /> 2750 Kelley Parkway <br /> Orono,MN 55356 <br /> RE: Building Permit 2016-01201 <br /> 460 Orchard Park Road <br /> Engineering Review#1 <br /> Dear Christine: <br /> As requested,we have completed an engineering review of the information submitted for the above <br /> referenced project. We offer the following comments for your consideration: <br /> 1. Perimeter erosion control measures(siltfence,rock entrance, etc.)and septic field protection fencing <br /> should be installed by the Contractor and inspected by the City prior to any other work. Contractor <br /> must provide minimum 24 hour notice prior to inspection. <br /> 2. Contractor must exercise care during construction to not block traffic on Orchard Park Road.Clear <br /> drive lanes must be maintained at all times. All vehicles and equipment should be parked on site <br /> during construction. <br /> 3. Retaining walls 4' or greater in height must be designed by a licensed Professional Engineer. Tiered <br /> walls must be separated horizontally by at least double the height of the lower wall, or they shall be <br /> considered one wall. Plans should be submitted prior to construction. <br /> 4. Biologs or erosion control blanket should be installed in swale bottoms after grading is complete to <br /> minimize erosion potential. <br /> 5. The applicant will be required to obtain a Minnehaha Creek Watershed District permit. A copy of the <br /> permit should be provided to the City conditional to final approval. <br /> If you have any questions or comments,please contact me to discuss. <br /> Sincerely, <br /> Bolton&Menk, Inc. <br /> ,Qcrteig 6411k <br /> Robert E.Bean,Jr.,P.E. <br /> Water Resources Engineer <br /> H:\ORNO\C13109539\15-3770_460 Orchard Park Road\Reviews\460 OrchardParkRd_2016-10.10.docx <br /> Bolton&Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.