Laserfiche WebLink
PERORATED <br /> . LATERALS <br /> SANDY LOAM SOIL •' = �.. ::,- :if.., <br /> LAYER F T . .' <br /> 0 STRAW OR - :� /. , ,, • <br /> -MARSH HAY COVERED I i • <br /> ,,,/ <br /> WITH RED - <br /> ROSIN PAPER •," <br /> r <br /> A :i...., r ' /7 <br /> ce,. / is r�/ <br /> 1. f OR 2" a,�.�,. i.• j ,./• <br /> PIPE FROM -_P �.• , jar �/, �.;- <br /> n. "•/ . <br /> ,•-•,;% 0.,F.P.::•7,.." .- -------,..1.: <br /> CLEAN FOLK <br /> .......1"..t•'. <br /> '� <br /> )//' ��/' ��,: �� , - DIVERSION FOR <br /> • t / NOTES= SURFACE WATER <br /> br` TOP SO I L •, _ =,»,> / �' I. SELECT AS LEVEL A SITE AS POSSIBLE FOR THE MOUND. <br /> / `'. •w' 2 REMOVE EXCESS VEGETATION.PLOW.DISK OR USING BACKHOE RAKER TEETH. <br /> - / -// ROUG1 CEN 111E SURFACE SOK. 6 INDIES DEEP. DO THIS ONLY F"HE MOISTURE <br /> / CONTENT IS LESS THAN THE PLASTIC UNIT(SOIL IS PLASTIC F KY CAN BE ROILED <br /> * ' /JTo AN INCH WIRE).DO NOT REMOVE ANY OF THE SURFACE SDNL, MOUND <br /> ,� PERfORMA ON .01'qSOIL DEPENDS ON 1 CARE TO P4cVQdTR4Ci10N <br /> !� �///4/ <br /> / ~ AND PUDDLING OF TF£CLAY DURING COhK R 19N.DO NOT L. HEAVY CONSTRUC- <br /> -,►` _ •� «'.- :� � �. / r I ION EQUIPMENT AND 00 NOT CONSTRUCT THE MOUND WHEN T CLAY SOIL IS <br /> �-•t _ ' , y / S ./,� W A PLASTIC CONDITION. <br /> ' `_ 44 y/ 3. USE ONLY TRACK-TYPE EQUIPMENT FOR CONSTRUCTING THE MAID SO AS NOT <br /> `- • „ ^9,1 / /' ^A ;�'' 10 COMPACT THE ORIGINAL SOIL. <br /> `` _-�` - �, 1, ` 'V'� I ' J": 4. <br /> RATENO AT LEAST SLOWER THAN 120 FEET M MINUTES NATURAL fir i ANBD FASTER WAVING THANTHs_ <br /> -�; _ <br /> _ • / MINUTES PER INCH.BEFORE PLACING THE LAYER OF CLEAN sec <br /> .-• °/p -�+. ^' ` ••__j ' �,` e / 5..THE 12 INCH LAYER OF CLEAN SMD IS PART OF THE MQUND o:ssmc ION.SAND <br /> SI 0 -�`. +E1 ••••:-.y.....";ti. :IS CONSIDERED C FAN F IT CAN PASS THCFRUIT;TAR TEST CONCRETE SANA <br /> CLE^ PE ` :,• • • A THE TOP OF TIE CLEAN SAND LAYER AND THE TOP OF TIE�( BED MUST BE <br /> SATND M ,..-.:,•-��-'- :�' `..-•.:61:4,-.1.,..f",: ODNSTRUCTED LEVEL <br /> - N '. 4- `'.. C�� �5,, I. DISTRIBUTION PIPES ARE 11h-INCH DIAMETER SPACED 40 INC-HES ON CENTER <br /> f ILL ��D v. -'s CONNECTED TOA MANIFOLD IN THE CENTER OF THE ROCt BED. PIPES WIVE <br /> (� 1. '' V-INCH PERFORATIONS DRILLED EVERY 36 INCHES AND POtN'IWG DOWNWARD. <br /> - OKI... Y `7 -''.Y,•,...",':•;..., <br /> \ .'.•:DI E INCHES OF ROCK ARE PL.ACED UNDER U5E A NEW DRILL BIT TO AVOID BURRS INSIDE <br /> PERFORATED .NERALS AND 2 <br /> 'v 1 P- ,_ -..-j---___ INCHES ABOVE FORA TOTAL ROCK DEPTH OF 12 INCHES. <br /> OP 9. THE ROCK IS FIRST COVERED WITH A LAYER OF HAY OR SIRIAW WHICH IS TI•EN <br /> ''-'•s-.._ COVERED ti--INCHES <br /> ITH A LAYER OF RED ROSIN RAPER LAPPED 6 OC-IES AT THE SEAMS. <br /> $gRRAT��n iO.AT LEAST$INCHES OF LOAMY SAND SHOULD BE PLACED OVEN THE TOP OF THE <br /> ERF A •• ROCK BED. <br /> L^y� I I. A 6-INCH LAYER OF TOP SOIL SHOULD BE PLACED OVER THE 911T.1., RE MOUND SO <br /> �`1 ETHAT A GRASS COVER CAN BE ESTABUSHED. <br /> '112. CROWN THE SOIL COVER AT LEAST 6 INCHES IN THE CENTER DIF THE MOUND • <br /> ABOVE THE ROCK LAYER SO THAT HEAVY RAIN WILL RUN OFF <br /> 13. SIDE SLOPES OF THE DIKES SHOULD BE NO STEEPER THAN 4 1 ON CLAY SOILS <br /> AND 3.1 ON SANDY SOILS. <br /> . 14; .DEPENDS ON THEAMOUNT-OF.DAILY <br /> £). <br /> • <br /> 15. MAXIMUM EFFLUENT DOSE PER PUMP CYCLE SHOULD BE NC MORE THE TABLE <br /> VALUES. <br /> 16. MINIMUM PUMPING RATE IS SHOWN IN TABLE. PUMPING HEAD MUST BE <br /> ADEQUATE TO OVERCOME ELEVATION DIFFERENCE.FRICTION -"SS PLUS 5 FEET <br /> FOR PERFORATED LATERALS. <br />