Laserfiche WebLink
• <br /> Bob Roden <br /> 460 Orchard Park Rd. <br /> Orono, Henn. Co. <br /> • <br /> (2) <br /> Keep all heavy equipment off of the proposed treatment area before and <br /> after construction. The treatment area should be marked off before <br /> construction. This Design is not valid & the System will need to <br /> be relocated if failure to protect the areas proposed for On-Site <br /> Sewage Treatment occurs. <br /> With proper installation and maintenance, this system should have no <br /> problem in treating septic effluent effectively. <br /> Recommend to pump the septic tank every year if there is only 1 tank <br /> & every 2 years if there are 2 tanks. <br /> even B. Schirmers �S <br /> SBS/ds <br />