My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P05601 - new septic system
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
420 Orchard Park Road - 32-118-23-23-0006
>
Septic
>
2002-P05601 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:39 PM
Creation date
4/25/2018 9:00:18 AM
Metadata
Fields
Template:
x Address Old
House Number
420
Street Name
Orchard Park
Street Type
Road
Address
420 Orchard Park Road
Document Type
Septic
PIN
3211823230006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE EVALUATION REPORT For Peterson Property <br /> Sewage Treatment System Page 2 <br /> GENERAL INFORMATION <br /> This design is for a Type 1,5 bedroom home and in accordance with the Minnesota Pollution Control <br /> Agency Standards and local ordinances. <br /> A seasonally high water table was evidenced at 14 inches of depth in Soil Borings 1 &2. The slope <br /> is about 6%. <br /> The soils at a depth of 12 inches in Test Hole 4 has a percolation rate of 17 minutes per inch. All <br /> neighboring wells are located more than 100 feet away from the proposed treatment area. <br /> NOTES: <br /> Keep all heavy equipment off the proposed treatment area before and after construction as much as <br /> possible. The treatment area should be marked off before construction. <br /> With proper installation and maintenance this system should have no problem in treating septic <br /> effluent effectively. <br /> This design will require an ejector pump. <br /> It is recommended that the septic tanks be pumped every 2 years. <br /> MOUND SYSTEM: <br /> Flow: 5 bedroom= 150 gallon/day/bedroom 150 x 5 = 750 gallons per day . <br /> 750 GPD x 1.00= 750 square feet. <br /> 10 foot wide rock bed 75 feet long= 750 square feet <br /> CONSTRUCTION EQUIPMENT: <br /> A rubber-tired tractor may be used for plowing or disking to prepare the soil surface but in no case <br /> shall a rubber-tired tractor be used after the surface preparation is completed. A crawler or tract-type <br /> tractor shall be used for mound construction. <br /> $OIL SURFACE PREPARATION: <br /> The discharge pipe from the pump to the mound area shall be installed prior to soil surface <br /> preparation. The trench excavated to install the discharge pipe shall be carefully backfilled and <br /> compacted to prevent seepage of effluent. <br /> The total area selected for the mound, including that under the dikes, shall be roughened in order to <br /> thoroughly break up any existing sod layers and to provide a suitable transition zone between the <br /> original soil and sand layer of the mound. The area shall be roughened only when the moisture <br /> content of the soil 8 inches below the surface is drier than the plastic limit. <br /> Surface preparation or roughening may be performed with a mold board plow, a disk plow, or a back <br /> hoe using only the teeth. Mold board plow furrows shall be at least 8 inches deep, shall be thrown <br />
The URL can be used to link to this page
Your browser does not support the video tag.