My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-P05601 - new septic system
Orono
>
Property Files
>
Street Address
>
O
>
Orchard Park Road
>
420 Orchard Park Road - 32-118-23-23-0006
>
Septic
>
2002-P05601 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:39:39 PM
Creation date
4/25/2018 9:00:18 AM
Metadata
Fields
Template:
x Address Old
House Number
420
Street Name
Orchard Park
Street Type
Road
Address
420 Orchard Park Road
Document Type
Septic
PIN
3211823230006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> PUMP sELEC[1ON PROCEDURE <br /> A. Determine pump capacity: <br /> Gravity Distribution <br /> t Minimum suggested is 20 gpin <br /> 2. Maximum suggested is 45 gpm <br /> Pressure Distibution <br /> 3. a Select number of perforated laterals Perforation Discharges in GPM <br /> b. Select perforation spacing = feet. (lead Perforation diameter <br /> c. Subtract 2 ft. from the rock layer length. feet fiches <br /> feet. liZelall <br /> r<, K <br /> Roc.t. ,< N- 2 ft. = <br /> d Determine the number of spaces between perforations. <br /> I <br /> 04 <br /> 056 0�a <br /> Length pert. spacing = ft. ft. = spaces z.ob oo 104 <br /> c. spaces + t = perforationsflateral <br /> f. Multiply perforations per lateral by number of laterals to a Use l 0loot single homes <br /> get total number of perforations. x - perforations. b Use t o feet(or anything else <br /> g.: tTrr x ��_- -gpm. /'/ <br /> SELECTED PUMP CAPACITY 44(69 gpm <br /> 13. Determine head requirements: Soil <br /> " """'`" <br /> /00 I Elevation difference between pump and point of discharge. °= •---- <br /> 5 feet roti p,fc kn6 1, _____-------- <br /> 2. <br /> 2. If pumping to a pressure distribution system, five feet for pressure <br /> required at manifold if gravit system, zero. q� `� y�a$,0��" <br /> Inlet 5AH.: t'a^v.loon O,r(f,e.te <br /> r0__ feet P;r.e <br /> 3 Friction loss ••t <br /> I <br /> a. Enter friction loss table with gpm and pipe diameter. <br /> Read friction�d loss in feet per 100 feet from table(F-14). <br /> F.L. = (vrL4_. ft./100 ft of pipe <br /> b. Determine total pipe length from pump to discharge Friction Loss in Plastic Pipe <br /> point. Estimate by adding 25 percent to pipe length for fitting Nominal <br /> loss,or use a fitting loss chart(F-1S feet). pipe dia. <br /> Equivalent pipe length • 1.25 times pipe length = Flow Rate 1.5" 2 3" <br /> _/20 x 1.25 = 150 feet gpm <br /> c. Calculate total friction loss by multiplying <br /> friction loss in ft/100 ft by equivalent ipe length. 20 2.47 0.73 0.11 <br /> `7 +100= 9.7 feet 25 3.73 1.11 0.16 <br /> J`D <br /> Total friction loss = ) x 30 5,23 155 0.23 <br /> 4. Total head required is the sum of elevation difference, 35 6.96 2.06 0.30 <br /> special head requirements,and total friction loss. 40 8.91 2.64 0.39 <br /> 45 11.07 3.28 0.48 <br /> _.__1 5 + 50 13.46 3.99 0.58 <br /> 55 4.76 0.70 <br /> (1) (2) (3c) 60 5.60 0.82 <br /> 65 6:4 0.95 <br /> TOTAL READ 1Q,7 feet 70 4 1-09 <br /> C. Pump selection <br /> 1. A pump must be selected to deliver at least <br /> . Co'Cogpm:.(StepA) witkat least a9. 7 feet.o.f:total head (Step.6)... • . <br /> ` _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.