My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-00038 - new house
Orono
>
Property Files
>
Street Address
>
H
>
Hunter Drive
>
1180 Hunter Drive - 25-118-23-42-0006 (Formerally Sixth Ave N)
>
Permits/Inspections
>
2018-00038 - new house
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:12 PM
Creation date
4/24/2018 3:34:26 PM
Metadata
Fields
Template:
x Address Old
House Number
1180
Street Name
Hunter
Street Type
Drive
Address
1180 Hunter Drive
Document Type
Permits/Inspections
PIN
2511823420006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Builder Acknowledgement Form <br /> Permit #2018-00038 / 1180 Hunter Drive <br /> Builder Representative Name: Parz� Co.-�,�o <br /> Permit Conditions: Initials <br /> **NOTE CHANGE** Before scheduling an exterior insulation and/or drain tile inspection, a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order 1/ <br /> will be issued. <br /> Schedule a minimum of one hour for the framing inspection. 1 <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land n <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to �` <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must l� <br /> remain until vegetation has been established. <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to 2 7 <br /> commencement of hauling from the site.The property owner shall be responsible for cleaning <br /> and repair of roadways for any adverse impacts. <br /> No underground sewer within 20 feet of well. <br /> Prior to the Certificate of Occupancy: ///��� <br /> Drainage and Utility Easements must be revised as necessary to adequately cover stormwater 19 <br /> (-- <br /> management facilities, including access to the outlet control device. <br /> An access route to the stormwater management facilities including the outlet control device <br /> must be provided. Access route should be a minimum of 8'. <br /> A Maintenance Agreement for stormwater management facilities must be submitted. The <br /> agreement should define maintenance responsibilities following completion of the project and 0 <br /> specify types and frequencies of inspection and maintenance activities. A report should be ( <br /> submitted annually to the City and MCWD briefly outlining inspections and maintenance <br /> performed during the year. <br /> Record drawings of stormwater management facilities must be submitted upon completion of <br /> the project. <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey must be submitted and <br /> approved. <br /> In the event of winter or other extended unfavorable weather conditions(which prevent the <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of � f <br /> Occupancy(TCO) may be necessary. A TCO requires a $10,000 escrow. <br /> w:\street files\hunter drive\1180\builder acknowledgement form 2018-00038.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.