Laserfiche WebLink
Rhvac-Residential&Light Commercial HVAC Loads Elite Software Development,Inc. <br /> Riccar Heating and CoolingIS Wooddale Munsell <br /> Andover,MN 55304 Page 2 <br /> Total Building Summary Loads <br /> Component Area Sen Let Sen Total <br /> Description Quan Loss Gain Gain Gain <br /> Andersen: Glazing-operable window, wood sash, u-value 1098.3 27,077 0 30,043 30,043 <br /> 0.29, SHGC 0.32 <br /> 4A-6-d: Glazing-Double pane low-e (e = 0.20 or less), 160 4,488 0 4,609 4,609 <br /> high performance, sliding glass door, e=0.05 on <br /> surface 2, any frame, u-value 0.33, SHGC 0.33 <br /> 10D-f: Glazing-French door, double pane low-e glass (e = 24 857 0 481 481 <br /> 0.10), insulated fiberglass frame, u-value 0.42, <br /> SHGC 0.32 <br /> 4A-6-d: Glazing-Double pane low-e (e = 0.20 or less), 96 2,693 0 3,036 3,036 <br /> high performance, sliding glass door, e=0.05 on <br /> surface 2, any frame, outdoor insect screen with 50% <br /> • coverage, u-value 0.33, SHGC 0.33 <br /> Andersen: Glazing-operable window, wood sash, u-value 48 1,142 0 1,610 1,610 <br /> 0.28, SHGC 0.32 <br /> 11N: Door-Metal - Polystyrene Core 48 1,428 0 404 404 <br /> 12F-Osw: Wall-Frame, R-21 insulation in 2 x 6 stud 4805.4 26,550 0 4,156 4,156 <br /> cavity, no board insulation, siding finish, wood studs <br /> 15B0-10sf-8: Wall-Basement, , R-10 board insulation to 1863.8 9,176 0 348 348 <br /> floor, no interior finish, 8'floor depth <br /> 16B-50: Roof/Ceiling-Under Attic with Insulation on Attic 3229 5,490 0 3,099 3,099 <br /> Floor(also use for Knee Walls and Partition <br /> Ceilings), Vented Attic, No Radiant Barrier, Dark <br /> Asphalt Shingles or Dark Metal, Tar and Gravel or <br /> Membrane, R-50 insulation <br /> 18A1-28o: Roof/Ceiling-Roof Joists Between Roof Deck 877 2,684 0 758 758 <br /> and Ceiling or Foam Encapsulated Roof Joists, <br /> Spray Foam Insulation, Dark or Bold-Color Asphalt <br /> Shingle, Dark Metal, Dark Membrane, Dark Tar and <br /> Gravel, R-28 open cell 1/2 lb. spray foam, 7.5 inches <br /> in 2 x 8 joist cavity, 1 inch on joist <br /> 21A-32: Floor-Basement, Concrete slab, any thickness, 2 2278 3,873 0 0 0 <br /> or more feet below grade, no insulation below floor, <br /> any floor cover, shortest side of floor slab is 32'wide <br /> 21A-28: Floor-Basement, Concrete slab, any thickness, 2 877 1,640 0 0 0 <br /> or more feet below grade, no insulation below floor, <br /> any floor cover, shortest side of floor slab is 28'wide <br /> 20P-30: Floor-Over open crawl space or garage, Passive, 951 2,829 0 266 266 <br /> R-30 blanket insulation, any cover <br /> Subtotals for structure: 89,927 0 48,810 48,810 <br /> People: 5 1,000 1,150 2,150 <br /> Equipment: 901 6,059 6,960 <br /> Lighting: 0 0 0 <br /> Ductwork: 0 0 0 0 <br /> Infiltration: Winter CFM: 161, Summer CFM: 87 14,651 1,349 1,206 2,555 <br /> Ventilation: Winter CFM: 255, Summer CFM: 255 9,253 3,955 1,415 5,371 <br /> Exhaust: Winter CFM: 255, Summer CFM: 255 <br /> Humidification (Winter) 19.12 gal/day : 7,013 0 0 0 <br /> Total Building Load Totals: 120,844 7,205 58,640 65,846 <br /> Check Figures <br /> Total Building Supply CFM: 2,681 CFM Per Square ft.: 0.326 <br /> Square ft. of Room Area: 8,221 <br /> Volume (ft3): 74,538 <br /> Building Loads <br /> Total Heating Required Including Ventilation Air: 120,844 Btuh 120.844 MBH <br /> Total Sensible Gain: 58,640 Btuh 89 % <br /> C:\Users\Kurt\Documents\Elite Software\Rhvac 9 Projects\Wooddale Munsell.rh9 Monday, January 08, 2018, 5:57 PM <br />