Laserfiche WebLink
Double 2x10 <br /> flush beam extension <br /> off house/ledger Footings: <br /> HOUSE Helical pier footing - - <br /> 16'-8" engineering report provided <br /> 12'-0" at final inspection <br /> Posts: <br /> Ground contact treated <br /> 6x6 posts <br /> Ledger: <br /> Treated 2x10 flashed <br /> and bolted with 3/16" x <br /> 5" LedgerLok bolts <br /> Beams: <br /> Double Treated 2x10 <br /> flush beams with <br /> maximum post overhang <br /> — of12" <br /> '-1 Joists: <br /> ' Treated 2x10 joists <br /> in <br /> 4-4 spaced at 12" on center <br /> b <br /> -T- 1 1 1 t <br /> 0oStringers: <br /> Treated 2x12 stringers <br /> spaced at 9" o.c. for <br /> ` Azek PVC decking <br /> Decking: <br /> 5/4x6 Azek PVC decking <br /> 6'-9" rin E Railings: <br /> Westbury aluminum <br /> railings with 4" posts. <br /> Triple 2x10 Max baluster spacing of <br /> Double 2x10 flush beam 4". 36"tall <br /> flush beam <br /> Bracing: <br /> Helical Pier 16 -8 <br /> I I footing (4) Simpson DTT1Z <br /> brackets fastened to 18" <br /> floor trusses per 2015 <br /> IRC building code <br /> PHI Decks Deck Project <br /> Pi3500 Vicksburg Ln N #302 Rebecca & JP Prenevost <br /> Plymouth, MN 55447 2350 Oliver Hill <br /> DECKS MN 612-399-6744 Scale: 1/4" = 1'-0" Orono, MN 55356 <br /> Lic #BC636117 <br /> November 17, 2017 <br />