Laserfiche WebLink
Y , <br /> dQ <br /> CITY OF ORONO <br /> .�► �, Street Address: Mailing Address: Telephone(952)249-4600 <br /> stn G' 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616 <br /> l�k>cSHO�'� Orono,MN 55356 Crystal Bay,MN 55323 www.cl.orono.mn.us <br /> July 11,2017 <br /> Steve Sauber <br /> Youngfleld Homes d/b/a Country Joe Homes <br /> 22260 Dodd Blvd <br /> Lakeville,MN 55044 <br /> Re: Building Permit Application#2017-00692 <br /> 2345 Oliver Hill <br /> On June 22, 2017 the City received a building permit application for a new single family home. Staff conducted a <br /> preliminary review based on the information provided and recommends the following items be submitted or revised in <br /> order for your application to be considered complete and for the plan review to continue: <br /> 1. Hardcover Calculations. The property is located in Tier 4 of the Stormwater Quality Overlay District. Hardcover <br /> calculations are shown on the survey. While the City does not feel hardcover is a concern on the property <br /> accurate information is necessary. Please have the surveyor prepare hardcover calculations using the City's <br /> hardcover calculation worksheets. Enclosed is a copy of the City's hardcover information packet. We are <br /> uncertain If the hardcover calculations shown on the survey include the deck and stairs, please provide <br /> clarification. <br /> 2. Certificate of Survey. A survey dated 6-14-17 was provided. Please provide two copies of an updated,full-size <br /> certificate of survey which meets all of the City's survey standards(enclosed): <br /> a. Top of Foundation. The top of foundation elevation is shown on the survey. Please have the surveyor <br /> show the point or spot where the top of foundation elevation is in reference to. Please note,we expect <br /> the location to be consistent when submitting the foundation as-built. <br /> b. First Floor Elevation. Please have the surveyor call out the first floor elevation. <br /> c. Landscape/Hardcover plan. Please have the proposed landscape plan shown on the survey. <br /> 3. Landscape Plan. Prior to the issuance of the building permit a landscape plan must be submitted showing all <br /> the proposed exterior/landscaping improvements,i.e.patios,grading,sidewalks,retaining walls,etc. The plan <br /> should include the name of the individual performing the work. Any proposed patios, grading, sidewalks, <br /> retaining walls shown on the landscape plan should also be reflected on the survey. Attached is a copy of the <br /> landscape plan which is to be completed by the developer. <br />