Laserfiche WebLink
1OIo <br /> CITY OF ORONO <br /> Street Address: Mailing Address: Telephone(952)249-4600 <br /> Gti2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616 <br /> lq ilk F Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> kESHO� <br /> February 16,2017 <br /> Steve Sauber <br /> Youngfield Homes d/b/a Country Joe Homes <br /> 22260 Dodd Blvd <br /> Lakeville, MN 55044 <br /> Re: Building Permit Application#2017-00108 <br /> 2335 Oliver Hill <br /> On February 7, 2017 the City received a building permit application for a new single family home. Staff conducted a <br /> preliminary review based on the information provided and recommends the following items be submitted or revised in order <br /> for your application to be considered complete and for the plan review to continue: <br /> 1. Certificate of Survey. A survey was submitted,but it does not include some of the City's survey requirements(copy <br /> attached). Our engineer has reviewed the survey and has the following comments: <br /> a. Show perimeter erosion control measures (silt fence, bio logs, etc.) down gradient from proposed work. <br /> Temporary construction entrance should be constructed. Measures must be installed by the Contractor <br /> and inspected by the City prior to any work. Contractor must provide a minimum 24 hour notice prior to <br /> inspection. <br /> b. Special care will need to be exercised in creating the drainage pattern on the sides of the property to <br /> ensure that run off is not directed onto the neighboring properties. <br /> c. Proposed well location should be depicted. <br /> d. The top of foundation elevation is shown on the survey. Please have the surveyor show the point or spot <br /> on the perimeter of the foundation where the top of foundation elevation is in reference to. Please note, <br /> we expect the location to be consistent when submitting the foundation as-built. <br /> After the above comments have been addressed, please provide two copies of an updated, full-size certificate of <br /> survey for our review. <br /> 2. Structural Plans. Only one set of structural plans were submitted. Please provide us with one more full-size set of <br /> structural plans. <br /> 3. Landscape Plan. Prior to the issuance of the building permit a landscape plan must be submitted showing all the <br /> proposed exterior/landscaping improvements, i.e. patios,grading,sidewalks, retaining walls, etc. The plan should <br /> include the name of the individual performing the work. Any proposed patios, grading, sidewalks, retaining walls <br /> shown on the landscape plan should also be reflected on the survey. For your reference, we have included a copy of <br /> the landscape plan associated with the development. <br /> Please be aware that separate permits are required for sewer and water connections. Feel free to contact me at 952.249.4620 <br /> or by email at cmattson@ci.orono.mn.us if you have any questions on the above requirements. <br /> Sincerely, <br /> CITY OF ORONO <br /> Cli"14#1ititall*fi <br /> ristine Mattson <br /> Planning Assistant <br /> c Steve Sauber,via email <br /> Greg&Jennie D'Alessandro <br /> Bohlen Surveying&Associates <br /> Roger Peitso, Building Official <br /> enclosures <br />