Laserfiche WebLink
Fees to be Charged YES NO <br /> Permit ✓ <br /> Plan Review • V <br /> State Surcharge if <br /> Investigation Fee t/' <br /> SAC–Number of SAC Units 1--Vii i- <br /> • <br /> Other(specify) f../ <br /> Square Footage $ per Square Footage <br /> Basement //73 X r 03- TZ. = $ 12/ S?9. / <br /> Lt, (An-.Prnmhid Z13 X 87. 44 _ $ lri,toZO. 1'6 <br /> 194-2nd Floor 1386 4-- 173 Z. X /D 3 ?- $ 34'f ozz. 5-4 <br /> Atok Garage /SO -- 7 X 3q. c4& _ $ 34 zjq-. 80 <br /> � <br /> - Dl9 <br /> Estimated Construction Value: $ �QJ 000 '� <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing 0 Site 4Plumbing 0 Grading/Filling <br /> Poured Wall ,Silt Fence/Erosion Control Mechanical 0 Fire <br /> ;Ec Foundation Survey 0 Hardcover Removal )( Fireplace 0 Water Connection <br /> 0 Framing 0 Other(specify) 0 Masonry Sewer Connection <br /> ('(Waterproofing/Drain tile ' Mfg. 0 Lawn Irrigation <br /> ❑ Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> x Framing 0 Septic <br /> Insulation <br /> !r As-Built Survey <br /> *Final <br /> Lathe Required State Permits <br /> ❑ Other(specify) <br /> Well zi.t! Electrical <br /> REMARKS (in-house): <br /> 72, <br /> luv...-7±—- , ' <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> O See Builder Acknowledgement Form <br /> ❑ Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />