Laserfiche WebLink
terms of the Glendale Cove Sewer and Water Service Agreement between the cities of Orono and Long Lake dated <br /> July 1, 2011. The developer is responsible for all sewer connection charges that may be due to the City of Long <br /> Lake. The Developer is responsible for installing the required sanitary sewer connections subject to approval by <br /> the City Engineer. The City will inspect these systems during construction to ensure proper installation. City water <br /> is not available to the property; each lot will be served by an individual well. <br /> 18. WETLAND AND WETLAND BUFFER AREAS. The Development/RPUDA/PUD#8 property <br /> contains approximately 1.24 acres of wetland. The wetland area is subject to the standard City Permanent Flowage <br /> and Conservation Easement and Restrictive Covenant for Wetland restrictions,and will be required to comply with <br /> MCWD wetland buffer requirements which may include having wetland buffer markers installed. The Developer <br /> must conform to the City's wetland and wetland buffer setback requirements within Municipal Code, Chapter 78, <br /> Article XI Wetlands Protection. <br /> 19. SITE ACCESS, PARKING AND STREET/TRAFFIC/PARIING SIGNAGE. The proposed <br /> plat includes seven (7) lots all of which will be served by a new private cul-de-sac road to be platted as an outlot <br /> and to be constructed by the Developer to City standards,with minimum paved road width of 28 feet and minimum <br /> cul-de-sac diameter of 80 feet. All 7 new lots will have driveways accessing the new road, and none shall have <br /> direct driveway access to Willow Drive. Because this is considered an urban development,the City will ultimately <br /> own and maintain the sanitary sewer lines. The Developer shall be responsible for all required traffic signage. <br /> 20. PARK DEDICATION AND TRAILS. The Developer shall pay the standard park dedication fee <br /> in lieu of land dedication based on the value of eight percent (8%) of the fair market value of the land being <br /> subdivided, but such fee must be between a minimum of$3,250.00 and a maximum of$5,550.00 per lot per Orono <br /> 2014 Fee Schedule. The established combined land market value of the properties being developed is$211,000 per <br /> the Hennepin County Assessor. For the proposed seven(7)lots,the Park Fee will be based on six(6)new lots,the <br /> existing home at 2350 Watertown Road being credited. Eight percent of$211,000 = $16,880; however, the park <br /> fee minimum based on 6 new dwelling lots is $3,250 x 6=$19,500 The final Park Dedication Fee is $19,500.00 <br /> to be paid by the Developer upon fmal plat application. The Developer shall dedicate a 10' easement along the <br /> 6112/14;MPG 9/16/14 7 Orono/Oliver Hill/No. 13-3637& 14-3685 <br /> 176712v2 <br />