My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
development contract/PUD agreement
Orono
>
Property Files
>
Street Address
>
O
>
Oliver Hill
>
2335 Oliver HIll - 34-118-23-33-0077
>
Misc
>
development contract/PUD agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:57:27 PM
Creation date
4/19/2018 10:50:54 AM
Metadata
Fields
Template:
x Address Old
House Number
2335
Street Name
Oliver
Street Type
Hill
Address
2335 Oliver Hill
Document Type
Misc
PIN
3411823330077
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• as-built sign locations, utility locations (must have as-built points showing elevations, lengths, <br /> etc.),tree locations,monument locations <br /> • as-built building locations <br /> • as-built pond contours,OHW,HWL,outlet structure locations,etc. <br /> • as-built wetland delineations <br /> • hard copies of signed as-builts (2 paper copies 22x34, 1 copy 22x34 Mylars, 1 copy 11x17, CD <br /> with signed PDFs of Record Plans) <br /> 7. PERMITS. The Developer shall obtain or require its contractors and subcontractors to obtain all <br /> necessary permits, including but not limited to: <br /> • Grading and Land Alteration Permit(City) <br /> • Utility Permit(City) <br /> • Erosion Control permit(MCWD) <br /> • MPCA Sewer Extension permit <br /> 8. DEWATERING. Due to the variable nature of groundwater levels and stormwater flows, it will <br /> be the Developer's and the Developer's contractors and subcontractors responsibility to satisfy themselves with <br /> regard to the elevation of groundwater in the area and the level of effort needed to perform dewatering and storm <br /> flow routing operations. All dewatering shall be in accordance with all applicable county, state, and federal rules <br /> and regulations. DNR regulations regarding appropriations permits shall also be strictly followed. <br /> 9. TIME OF PERFORMANCE. The Developer shall install all required public and private <br /> improvements within one year from the effective date of this Contract. The Developer may, however, request an <br /> extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted <br /> by the Developer to reflect cost increases and the extended completion date. Final wear course placement extensions <br /> must have the written approval of the City Engineer. <br /> 10. LICENSE. The Developer hereby grants the City, its agents, employees, officers and contractors a <br /> license to enter the Development/RPUDA/PUD #8 to perform all work and inspections deemed appropriate by the <br /> City in conjunction with the development. <br /> 11. EROSION CONTROL. Prior to initiating site grading,the erosion control plan, as documented in <br /> Sheet 4 of 6 - Grading Plan and Sheet 5 of 6 - SWPPP, shall be implemented by the Developer and inspected and <br /> approved by the City or the Minnehaha Creek Watershed District. The City or Minnehaha Creek Watershed District <br /> may impose additional erosion control requirements if they would be beneficial. All areas disturbed by the excavation <br /> 6/12/14;MPG 9/16/14 4 Orono/Oliver Hill/No. 13-3637& 14-3685 <br /> 176712v2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.