Laserfiche WebLink
• <br /> 8 feet of the already limited-depth driveway backup apron. This would appear to be less than <br /> desirable, although not regulated by City code. <br /> Lot 3, Block 1: We have determined that the upper floor for the house proposed for Lot 3, Block 1 is <br /> a story, not a half-story. Our analysis was forwarded to the architect last Thursday. <br /> Lot 1, Block 1: We have spent a significant amount of time assisting Kelly in resolving the placement <br /> of a house on Lot 1, Block 1 in order to make that lower level meet the criteria to be considered as <br /> basement. The latest information we reviewed indicated a house plan for which the lowest level was <br /> a story by definition. This information was sent to Kelly on May 13. <br /> Subdivision As-Built Grading Survey Required. All of the above make it imperative that the City <br /> be provided ASAP an as-built grading survey that will identify for the entire subdivision whether the <br /> current existing grade matches the new existing grade established in the approved grading plan. <br /> Assuming the as-built survey will show that the actual grading does not match the approved grading <br /> plan, additional review will be needed to determine whether or not actual site grading changes are <br /> necessary. Whether or not the current existing grades match the approved grading plan, we will be <br /> using the approved grading plan as the new existing grade for building height and story <br /> determinations. <br /> Willi has advised that Schoborg Land Services will not have a crew available to complete an as-built <br /> grading survey for approximately three weeks. For the time being, we will only accept surveys for <br /> individual building permits if they indicate the approved grading plan contours as well as the proposed <br /> final contours. <br /> Road Construction. I have been advised by Willi that the first lift of asphalt on the road is anticipated <br /> to be placed this week. Once the first lift is installed, we should be in a position to begin issuing <br /> building permits. <br /> I understand Will Haack has requested a meeting. I am only available Wednesday afternoon this <br /> week and will be out of the office Thursday and Friday. I will be available the entire week of June 1- <br /> 5. Please contact me to establish a time to meet. <br /> Mike <br /> Michael P. Gaffron <br /> Senior Planner <br /> City of Orono <br /> (Street Address) 2750 Kelley Parkway <br /> (Mailing Address) P.O. Box 66, Crystal Bay , MN 55323 <br /> Phone: (952)249-4622 <br /> Fax: (952) 249-4616 <br /> 3 <br />