My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00410 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Olive Avenue
>
2327 Olive Avenue - 17-117-23-44-0074
>
Permits/Inspections
>
2014-00410 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:45:10 PM
Creation date
4/18/2018 10:23:07 AM
Metadata
Fields
Template:
x Address Old
House Number
2327
Street Name
Olive
Street Type
Avenue
Address
2327 Olive Avenue
Document Type
Permits/Inspections
PIN
1711723440074
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"W�o <br /> CITY OF ORONO <br /> Street Address: Mailing Address: Telephone(952)249-4600 <br /> 111C(;'' 2750 Kelley Parkway P.O.Box 66 Fax (952)249-4616 <br /> � Orono,MN 55356 Crystal Bay,MN 55323 www.ci.orono.mn.us <br /> May <br /> Joseph& Laura McCurdy <br /> 2324 Shadywood Road <br /> Wayzata, MN 55391 <br /> Re: Building Permit Application#2014-00410 <br /> On May 6, 2014 the City received a building permit application for an attached garage/addition. Your application is <br /> incomplete. The following items must be submitted or revised in order for your application to be considered <br /> complete and for the plan review to continue: <br /> 1. Certificate of Survey. City Engineer, Jesse Struve reviewed the survey. His comments are enclosed. Please <br /> provide two copies of an updated,full size certificate of survey which meets all of the City's survey standards <br /> (enclosed)indicating existing and proposed grading especially in the area where the shed is to be removed. <br /> 2. Demolition Permit. A demolition permit must be submitted for items to be demolished or removed. A <br /> demolition permit application is enclosed. <br /> 3. Building Plans. The building plans submitted dated 5/14/14 are not to scale. Please provide two sets of <br /> plans that are scalable. <br /> 4. Hardcover Calculations. The property is located in Tier 3 of the Stormwater Quality Overlay District. Please <br /> have the surveyor prepare hardcover calculations, showing existing and proposed hardcover, specifically <br /> addressing if the concrete sidewalk, concrete pad and concrete steps are to remain or be removed. These <br /> items are currently not shown on the proposed hardcover calculation worksheets. The survey does not show <br /> them as being removed. Please clarify. Attached is a copy of our hardcover information packet. <br /> 5. Escrow & Escrow Agreement. Permits involving grading and/or review by the City's engineer require <br /> submittal of an escrow and an escrow agreement. The purpose of the escrow is to guarantee reimbursement <br /> to the City for out-of-pocket costs incurred during the review of your plans. Additionally this escrow will <br /> guarantee conformance with City Code Chapter 79 relating to erosion control and stormwater. The required <br /> escrow amount for this project is$2,500. The escrow agreement is enclosed. The property owner must sign <br /> the escrow agreement and submit a check for$2,500. <br /> Your project may trigger the Minnehaha Creek Watershed District's(MCWD) permitting requirements; please contact <br /> the MCWD directly at 952-471-0590 regarding your project. Please note, the City of Orono will not issue a building <br /> permit without a copy of MCWD permits or documentation from the MCWD stating the proposed project does not <br /> trigger any of their permitting requirements. The above information is required in order for the plan review to <br /> continue. Please feel free to contact me at 952.249.4620 or by email at cmattson@ci.orono.mn.us if you have any <br /> questions on the above requirements. <br /> Sincerely, <br /> CITY OF ORONO <br /> Cinfth1 ktite <br /> Christine Mattson <br /> Planning Assistant <br /> c Laura McCurdy via email <br /> David Pemberton via email <br /> Lyle Oman, Building Official <br /> enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.