Laserfiche WebLink
0.45 gpd/ft2 Absorption area Soil Loading Rate, which gives a mound ratio of 2.7 (minimum) <br /> (this must match the soil boring log) desired mound ratio 2.7 <br /> 24, 11 percent site slope (0-20% range) 11 (%downslope site slope, if different than upslope) <br /> 's. 22 inches, or 1.8 ft. to Redox or other limiting condition (need at least 12" to be a Type I) <br /> Treatment zone contains 0 inches of 0%soil credit, and 0 inches of 50% soil credit. Giving a: <br /> 26) 14 inch, or 1.2 ft. Sand Lift Mound CRITICAL FOR FUTURE CERTIFICATIONS!!! <br /> 27) 27.0 ft.Total ABSORPTION width (with sand beyond rockbed as follows:) <br /> 28) 0.0 ft. upslope and sideslope <br /> 17.0 ft. Downslope <br /> Individual slope ratios give BERM widths (topsoil beyond rockbed) of: <br /> 29) 4:1 upslope ratio 9 ft. upslope berm <br /> 30) 3:1 sideslope 13 ft. sideslope berms <br /> 3 i) 4:1 downslope 30 ft. downslope berm <br /> 32) Overall Dimensions: 10.0 ft. wide by 63.0 ft. long Rock bed <br /> 49 ft. wide by 89 ft. long Mound footprint <br /> 4" inspection pipe <br /> 18" cover on top <br /> k Upslope berm 9 ) Downslope berm 30 <br /> .....40000011101.11.1111111111111111 - <br /> ��� 12" cover on sides <br /> (6"loamy cap&6"topsoil) <br /> 1.2 Clean sand lift <br /> _ — <br /> 1.8 Depth to Limiting <br /> Limiting Condition _ ---------------__ <br /> Absorption Width 27.0 1'— ------------_ <br /> Note: <br /> For 0 to 1% slopes, Absorption Width is measured from the ger/equally in both directions. <br /> For slopes >1%, Absorption Width is measured downhill from the upslope edge of the Bed <br /> 33) Rock Bed: <br /> 10.0 ft. by 63.0 ft. by 6 inches under pipe, plus 20%gives 21 yd'or*1.4= 29 ton <br /> 3->> Mound Sand: (note: volume is based on 3:1/4:1 slope from top of rockbed, Exchange sand for loamy cap if desired) <br /> 19.6 up + 114.3 downslope + 11.9 ends + 40.1 under rock= 223 yd'or*1.4= 312 ton <br /> plus 20% <br /> Loamy Cap: <br /> 45 ft. by 85 ft. 6"deep, plus 20%gives 85 yd'or*1.4= 119 ton <br /> sn Topsoil: <br /> 49 ft. by 89 ft. 6"deep, plus 20%gives 97 yd'or*1.4= 136 ton <br /> I hereby certify that I have completed this work in accordance with all applicable ordinances, rules and laws. <br /> Rusty Olson"s Soil Ft Perc 810 12/6/2017 <br /> /Designer Signature Company License# Date <br />