Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Friday,January 12, 2018 10:04 AM <br /> To: Christine Mattson <br /> Cc: Roger Peitso <br /> Subject: RE:420 Lakeview Parkway <br /> Chris, <br /> I've reviewed the subject grading plan and stamped it approved with the following comments: <br /> 1. There is a Bio filtration basin that was constructed as part of the development stormwater management plan <br /> (see excerpt below). It should be protected. It must be shown on the as built grading survey for the property <br /> for the record. <br /> 2. Perimeter sediment control measures must be installed by the contractor and inspected by the City prior to any <br /> work, including demolition.Contractor must provide minimum 24 hour notice prior to inspection. <br /> Adam <br /> 1 <br />