Laserfiche WebLink
Good afternoon, <br /> Attached is the revised survey, as well as second sheet at 20 scale. <br /> Regarding the french drain,that was actually initially drawn in when we were considering trying to do a full basement <br /> with a below-grade exterior door on the west side of the addition going down to provide basement access--the french <br /> drain was to remove water from the below-grade exterior stairwell to keep it out/away from the below-grade basement <br /> door. We ended up not doing a full basement,so no exterior door and we forgot to remove the french drain from the <br /> plan--I will ask my architect to update the plan to remove the french drain. <br /> We will have gutters on the addition, so all roof water will drain to the lakeside of the home. <br /> Please let us know of anything further. Thank you very much! <br /> Scott Falkum (homeowner) <br /> On Fri, Mar 9,2018 at 4:02 PM,Christine Mattson<CMattson@ci.orono.mn.us>wrote: <br /> > Hi Rob, <br /> >Our engineer has reviewed the survey and building permit and has the <br /> >following comments: <br /> >An attempt was made to review the subject grading plan however it is <br /> >too small to make out any detail. Based on what he could see, he has <br /> >the following comments: <br /> > 1. The grading plan does not appear to show and proposed changes to <br /> >grade. However Sheet Al of the building plan depicts the installation <br /> >of a French drain system. <br /> >2. The grading plan does not depict perimeter sediment/erosion <br /> >control measures. The grading plan should be revised to indicate <br /> >perimeter erosion control measures(silt fence, bio logs,etc.)down <br /> >gradient from proposed work. Measures must be installed by the <br /> >contractor and inspected by the City prior to any work. Contractor <br /> > must provide a minimum 24 hour notice prior to inspection. <br /> >3 <br /> The French drain shown on <br /> >Sheet <br /> >Al is likely there to address this concern but should be shown on the <br /> >grading plan. <br /> > Please have your surveyor address the above comments and submit an <br /> > updated survey for our review. Please provide the updated survey in a <br /> 2 <br />