My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: exclusion from sewer project
Orono
>
Property Files
>
Street Address
>
O
>
Old Long Lake Road
>
0990 Old Long Lake Road - 35-118-23-14-0006
>
Correspondence
>
Re: exclusion from sewer project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:57:58 PM
Creation date
4/12/2018 1:01:23 PM
Metadata
Fields
Template:
x Address Old
House Number
990
Street Name
Old Long Lake
Street Type
Road
Address
990 Old Long Lake Road
Document Type
Correspondence
PIN
3511823140006
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> The proposed assessment is based on the project cost divided by eleven units. Only seven units <br /> will be included in the project assessment. Three properties have new conforming septic systems, <br /> and the owners have requested exclusion. The remaining unit, not assessed, is the Summit Beach <br /> Park property. The following property owners have requested, and qualify, for exclusion from <br /> the project. These parcels were not included in the assessment roll. <br /> Bruce Dayton, 965 and 990 Old Long Lake Road <br /> Maury Taylor, 550 East Long Lake Road <br /> Award of Contract <br /> The bid opening for this project was held on June 6th. Four bids were received for this project. <br /> The Fox Ridge and East Long Lake projects were bid together. The lowest responsible bidder was <br /> MinnComm Utility Construction Company, Mora Minnesota with a bid of$90,760 for the east <br /> Long Lake portion of the project. A bid tabulation and letter of recommendation, from the City <br /> Engineer, for a contract award to MinnComm Utility Construction Company is attached. <br /> After construction is complete, and final costs are known the actual assessment can still be <br /> adjusted downward, in a revised assessment roll, before submission to Hennepin County in <br /> December. This assessment roll lists an 8% interest rate, past practice has been to lower the <br /> interest rate dependant on the interest rate received on the project bonds. Eight percent is the <br /> maximum interest rate that can be charged. The actual interest rate on recently completed projects <br /> has been 6.25%. <br /> Unless a large number of assessment appeal notices are received, we are recommending Council <br /> approval of the attached resolutions to adopt the assessment roll and award the contract for this <br /> project to MinnComm Utility Construction Company in the amount of$90,760 for the East Long <br /> Lake portion of the project. <br /> COUNCIL ACTION REQUESTED: <br /> Motion to approve resolution adopting the assessment roll for the East Long Lake Sanitary Sewer <br /> Improvements. <br /> Motion to approve resolution awarding the contract for the East Long Lake Sanitary Sewer <br /> Improvements to MinnComm Utility Construction Company, Mora Minnesota in the amount of <br /> $90,760. <br />
The URL can be used to link to this page
Your browser does not support the video tag.