Laserfiche WebLink
etft`rn. <br /> ,� cjilik-iii.:tU �� CITY Oh ORONO <br /> �OO �'' SEPTIC SYSTEM APPROVAL <br /> _ ? '`�+ CITY of ORONO <br /> li,f,?-:'-,- t: <br /> Municipal Offices <br /> \, ,,,,,, ti Post Office Box 66 <br /> , j__._ <br /> Crystal Bay,Minnesota 55323 0006 <br /> ikESHD.¢ <br /> LOCATION: 985 Old Long Lake Rd. <br /> OWNER: Dick Rinehart <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: <br /> SITE EVALUATOR: Swedlund Septic ServicEPORT DATE: September 2, 1995 <br /> The City of Orono has Approved your on-site system design as of October 24, 19 9 5 <br /> (approved-disapproved) (date) <br /> with the following comments: Property lines must be verified prior to system <br /> installation. <br /> TI-IIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OP ORON• <br /> BY / i' i / %I/J <br /> Stephen •c man, On-site Systems Manager <br /> TELEPHONE-473-7357• FAX-473-0510 <br />