My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-00458 - roofing
Orono
>
Property Files
>
Street Address
>
O
>
Old Long Lake Road
>
0900 Old Long Lake Road - 35-118-23-14-0008
>
Permits/Inspections
>
2008-00458 - roofing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:57:59 PM
Creation date
4/12/2018 10:51:41 AM
Metadata
Fields
Template:
x Address Old
House Number
900
Street Name
Old Long Lake
Street Type
Road
Address
900 Old Long Lake Road
Document Type
Permits/Inspections
PIN
3511823140008
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ftom:LES JONES ROOFING 952 881 7009 12/30/2008 11 :44 #882 P.002/003 <br /> From:LES JONES ROOFING 952 881 7009 12/15/2008 09:44 #853 P.001/008 <br /> _ f <br /> q6-2. <br /> 6 2. 11 <br /> 7 <br /> /77- ida,vi-eserA444 <br /> .401"ki <br /> 1 1111 <br /> LES4p3PIESRo 3. <br /> SNOPO R A T f D <br /> MN License WW1 <br /> November 10, 2008 <br /> Bruce Dayton <br /> 900 Old Long Lake Road <br /> Wayzata, MN 55391 <br /> We have inspected the existing roofing on the upper level of your home. The existing <br /> roofing consists of deteriorated built-up asphalt over wood. Les hones Roofing will be <br /> bidding on the complete tear off and reroof of this roof section only of your home. <br /> We propose to do the following work. ft b <br /> SPECIFICATIONS <br /> Tear-off <br /> 1. We will tear-off the existing roofing and perimeter metal flashing down to the <br /> roof deck. <br /> During the tear off process, debris may silt down through the roof deck. <br /> Therefore, we highly recommend that you remove or cover any Items that may <br /> be under this area. We cannot be held liable(referring to the debris sifting <br /> through) for any interior contents during this process. <br /> 2. All tear off debris will be deaned up and hauled away. <br /> Insulation <br /> 1. We will Install one layer of flat insulation. <br /> 2. V2""wood fiberboard insulation will be installed. <br /> 3. The insulation will be mechanically fastened to the roof deck with screws and • <br /> plates. <br /> Roof Membrane <br /> 1. 60 mil reinforced EPDM will be adhered over the insulation. <br /> 2. Reinforced perimeter fastening strip will be installed (WHERE?). This will provide <br /> proper termination to the EPDM. <br /> .',r' • t nh••n; /7{hrs RF..P.1 CC/.nA r1C'11004 nnA4 r-.., nrrn••n= -.,. . <br />
The URL can be used to link to this page
Your browser does not support the video tag.