Laserfiche WebLink
Fees to be Charged YES NO <br /> Plan Review V <br /> Sties Surcharge t,"- <br /> Investigation Fee <br /> SAC—Number of SAC Units 1.7 <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1st Floor X = $ <br /> 2nd Floor X = $ <br /> Garage X = $ <br /> A <br /> Estimated Construction Value: $ I&©� g©U <br /> Orono Inspections Required Work Requiring Separate Permits <br /> O Footing 0 Site Plumbing O Grading/Filling <br /> O Poured Wall 0 Silt Fence/Erosion ControlMechanical 0 Fire <br /> O Foundation Survey 0 Hardcover Removal Fireplace 0 Water Connection <br /> O Framing 0 Other(specify) 0 Masonry 0 Sewer Connection <br /> O Waterproofing/Drain tile 1Nfg. 0 Lawn Irrigation <br /> O Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing 0 Septic <br /> Insulation <br /> 0 As-Built Survey <br /> Final <br /> O Lathe Required State Permits <br /> O Other(specify) <br /> 0 Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> O See Builder Acknowledgement Form <br /> O Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />