My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#662-status of proposal-1976
Orono
>
Property Files
>
Street Address
>
O
>
Old Long Lake Road
>
0480 Old Long Lake Road - 36-118-23-34-0011
>
Resolutions
>
#662-status of proposal-1976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:03:36 PM
Creation date
4/11/2018 9:31:57 AM
Metadata
Fields
Template:
x Address Old
House Number
480
Street Name
Old Long Lake
Street Type
Road
Address
480 Old Long Lake Road
Document Type
Resolutions
PIN
3611823340011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 4 <br /> RESOLUTION NO. 662 <br /> RESOLUTION SETTING FORTH THE CURRENT <br /> STATUS OF THE HERRICK CIRCLE PROPOSAL <br /> WHEREAS , in order to assist the property owner, Mr. <br /> Nafstad, in his proposal to develop Herrick Circle in a manner <br /> as previously reviewed by the City Council, <br /> NOW THEREFORE, the City Council of the City of Orono <br /> sets forth the following statements: <br /> 1. The Metropolitan Waste Control Commission has <br /> approved Herrick Circle's proposed sewer line. <br /> 2. The City of Wayzata has agreed to accept the efflu- <br /> ent flowing from the Herrick Circle property. <br /> 3. The sanitary sewer line which is to be constructed <br /> on the Herrick Circle property may be used as a temporary <br /> holding tank for the effluent from one home, pursuant to <br /> plans acceptable to the City Engineer. This temporary holding <br /> tank may be used in the future as part of the complete sani- <br /> tary sewer system line if said sewer line is approved by the <br /> City of Orono. <br /> 4. The sewer line that is to be installed on public <br /> property and the sewer line to be installed on Herrick Circle <br /> property shall be installed pursuant to city specifications <br /> and shall be compatible with existing installations so that <br /> it can be maintained with the rest of the sewer system of the <br /> City of Orono. <br /> 5. No permission is granted Mr. Nafstad to hook up to <br /> the sanitary sewer line to be built on public property and such <br /> permission shall be withheld until and only if the City Council <br /> approves the rezoning and platting of the property in the future. <br /> 6. Any utility construction, restoration procedures and <br /> alignment, shall be reviewed and passed upon by the City Council <br /> prior to construction. <br /> 7 . In no event shall there be any construction of the <br /> sewer line in the public right of way until spring, 1976. <br />
The URL can be used to link to this page
Your browser does not support the video tag.