Laserfiche WebLink
• <br /> 'RECEIVE® <br /> CITY OF ORONO APPLICATION FOR MECHANIGO PERMIT <br /> Box 66 (2750 Kelley Parkway) QCT <br /> Crystal Bay, MN 55323 OF OBON0 <br /> • <br /> • <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. • <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical Designs - Complete calculations, details and specifications are required for each heating, <br /> ventilation,humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357. <br /> Please check one: ew Addition Repair Replace <br /> t/ Residential Commercial <br /> JOB SHE: //5 c) Oa (/ 5-Aid Sty ot-'64 ` • . <br /> Owner's Name: 4(2 54e TelephoneNumber: 475' <br /> O � <br /> Mailing Address: 5- m ,e City: 2,e0AJo Zip: 5.5 3 a 3 <br /> Contractor'sName: TelephoneNumber: 7>z1-00ivo <br /> MailingAddress: SUBURBAN AIR City: Zip: <br /> 8419 CENTER DRIVE <br /> SYSTEM DESCRIPTIOWIN EAPO LIS, MN 55432 <br /> HEATING SYSTEMS <br /> Quantity: <br /> Make: <br /> Model: LF 24-ISA <br /> Fuel: N/0 <br /> Flue Size: <br /> Input BTUs: 4s xU <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: . <br /> Make: <br /> Model: <br /> Tons: <br /> H. Power <br /> A <br />