Laserfiche WebLink
light&sound device,this is In case of a pump failure. The manifold&supply line <br /> must have back drainage to the pumping chamber. The distribution pipes shall have <br /> their ends capped. Be sure the rock&sand fill material are clean. The sod layer <br /> below the entire mounded area must be turned over,just break up the sod. The total <br /> supply line length is 300'with 90'of the existing supply line is existing. <br /> If the tanks have less than 2'of cover,the lids,risers&maintenance hole covers <br /> must be insulated to a value of R10. <br /> Cieanouts for each lateral must be insulated&be accessible from finished grade in <br /> an irrigation box with a ball valve. <br /> All neighboring wells are located greater than 100'away from the proposed <br /> treatment area. <br /> Keep all heavy equipment off of the proposed treatment area before and after <br /> construction. The treatment area should be marked off before construction. This <br /> design Is not valid&the system will need to be relocated if failure to protect the <br /> sites for new on-site sewage systems. <br /> MANAGBMBNT PLANE <br /> The tanks need to be maintained at a minimum of 1 time every 2 years,check with <br /> you pumper to set up a schedule. <br /> System inspected for areas by owner&or inspector as determined by the local unit <br /> of Government. <br /> Any other requirements as determined by the local unit of Government. <br /> With proper installation&maintenance,this system should have no problem In <br /> treating septic effluent effectively. <br />