Laserfiche WebLink
• <br /> • <br /> -PER =ORATED - <br /> Pr--.7.;----- LATERALS <br /> SANDY LOAM SOIL— - ,,��. -;a•� _ .� .;r <br /> jay/yam \. <br /> LAYER OF STRAW OR ;','f ..;.,.•� <br /> MARSH HAY COVERED `- . • =`� • '� / /' <br /> WITH RED ROSIN PAPER % i// ,r• <br /> ,. i ' 4. <br /> f ,,; /.� // / ". <br /> I '2 OR 2 : j' - <br /> . PIPE FROM PUMP /�: : '� i , y.:;�';• // . �% <br /> �" <br /> g, _ <br /> CLEAN BOCK - ..�;��" .�� �� r" Y t: // <br /> • • / e <br /> ,� DIVERSION FOR <br /> � ,/% % / �' NOTES. SURFACE WATER <br /> • 6" TOPSOIL �� - -f / j y ,�/ L SELECT AS LEVEL A SITE AS POSSIBLE FOR THE MOUND. <br /> i7j' = 2. REMOVE EXCESS VEGETATION.PLOW. DISK OR USING BACKHOE RAKER TEETH. <br /> - /7 ROUGHEN THE SURFACE SOIL 6 INCHES DEEP DO THIS ONLY IF T!-h: MOISTURE <br /> i- /- /./ <br /> CONTENT IS LESS THAN THE PLASTIC LIMIT (SOIL IS PLASTIC IF IT CAN BE -OILED <br /> _r • <br /> INTO AN '/s INCH WIRE).DO NOT REMOVE ANY OF THE SURFACE SOIL. MOUND <br /> �."� •+S"�� PERFORMANCE ON CLAY SOIL DEPENDS ON EXTREME CARE TO PREVENT COM HCTION <br /> •, / AND PUDDLING OF THE CLAY DURING CONSTRUCTION. DO NOT USE HEAVY CDNSTRUC- <br /> -� - +« --• �'= •`? ' • - ION EQUIPMENT AND DO NOT CONSTRUCT THE MOUND WHEN THE CLAY SOIL IS <br /> ��..,.,. ...-----r•---• - -. - y / / J IN A PLASTIC CONDITION. <br /> "=��` �'� ' 3. USE ONLY TRACK-TYI£ EQUIPMENT FOR CONSTRUCTING THE MOUND SO AS NOT <br /> �� ' -� .�• TO COMPACT THE ORIGINAL SOIL. <br /> • `~ _- �^ _ - �9�,.-� / �� `• • <br /> I -'/-• - 4. <br /> TION RATE NO SLOWER THAN 120 MINUTES PENATURALR INCH AND NO FASTER THAN 5 <br /> ' --`?"--r.... y _ ' . I �] •' . MINUTES PER INCH.BEFORE PLACING THE LAYER OF CLEAN SAND. <br /> • <br /> / . '° 1 .4 ` ' G - r- y.--„,-,•:, 5. THE 12 INCH LAYER OF CLEAN SAM) IS PART OF THE MOUND CONSTRUCTION. SAND <br /> S h 1+ t - .r`' - .-!. :,- • J IS CONSIDERED CLEAN IF IT CAN PASS THE"FRUIT JAR TEST FOR CONCRETE SAND <br /> N ~ <br /> S ` n 1.O E „ ► 4;' :` 6 THE TOP OF THE CLEAN SAND LAYER AND THE TOP OF THE ROCK BED MUST BE <br /> n' AN ` ��-J�� . „ ' ---,,.-..).i.-,_! ....„-,,...41:,._,..--_-,...,.,•,....,-.....,..:_v,.....-,-,--,." <br /> CONSTRUCTED LEVEL <br /> ANp i `,• 7' DISTRIBUTION PIPES ARE it/2-INCH DIAMETT_R SPACED 40 INCHES ON CENTER <br /> FI LL SOD 36 �\ ; •` AND CONNECTED TO A MANIFOLD IN THE CENTER OF THE ROCK BED. PIPES HAVE <br /> 1_ <br /> / INCH PERFORATIONS DRILLED EVERY 36 INCHES AND POINTING DOWNWARD. <br /> BR ENA'). !-. ---.. .,_-_::::•,.-...,_•-..,•. <br /> 'r , UsE A NEW DRILL BIT TO AVOID BURRS INSIDE THE PIPE. <br /> 0 F\ �I� `"a '••• .a NINE INCHES OF ROCK ARE PLACED UNDER THE PERFORATED LATERALS AND 2 <br /> Up - INCHES ABOVE FOR A TOTAL ROCK DEPTH OF 12 INCHES. <br /> 9.THE ROCK IS FIRST COVERED WITH A LAYER OF HAY OR STRAW WN;CH IS THEN <br /> /� • ``:-J--- COVERED WITH A LAYER OF RED ROSIN PAPER LAPPED 6 INCHES AT THE SEAMS. <br /> • SARN`�TIJ R, -�10.AT LEAST,__- <br /> pa INCHES OF LOAMY SAND SHOULD BE PLACED OVER THE TOP OF THE <br /> '`A L :a... ROCK BED- <br /> II. A 6-INCH LAYER OF TOP SOIL SHOULD BE PLACED R THE <br /> �� E <br /> EAYE�12 THAWN GGRASS A SOIL COVER CAN <br /> BEAT LEASTST6uSHED.INCHES IN THE CENTER OFiTHEMOUND MOUNOSO <br /> ABOVE THE ROCK LAYER SO THAT HEAVY RAIN WILL RUN OFF. <br /> 13. SIOE SLOPES OF THE DIKES SHOULD BE NO STEEPER THAN 4,1 ON CLAY SOILS <br /> AND 3,1 ON SANDY SOILS. <br /> M.-O • LAYER.DEPENDS ON THE AMOUNT_OF DAILY <br /> SE £)- <br /> 15. MAXIMUM EFFLUENT DOSE PER PUMP CYCLE SHOULD BE NO MORE THE TABLE <br /> VALUES. <br /> 16. MINIMUM PUMPING RATE IS SHOWN IN TABLE. PUMPING HEAD MUST BE <br /> ADEQUATE TO OVERCOME ELEVATION DIFFERENCE. FRICTION LOSS PLUS 5 FEET <br /> FOR PERFORATED LATERALS. <br />