My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info including old designs
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
1130 Old Crystal Bay Road South - 09-117-23-14-0007
>
Septic
>
septic info including old designs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:07 PM
Creation date
4/9/2018 2:25:52 PM
Metadata
Fields
Template:
x Address Old
House Number
1130
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
South
Address
1130 Old Crystal Bay Rd S
Document Type
Septic
PIN
0911723140007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#1405 Thomas G. Colwell, 2640 North Shore Drive - <br /> Proposed Preliminary Plat - Site Evaluation Review <br /> May 5, 1989 <br /> Page 2 of 2 <br /> Regarding the proposed easement for access, that access is <br /> over the existing driveway. Any major revision of the proposed <br /> subdivision that will revise the actual location of the access <br /> drive must be considered in relation to the tested drainfield <br /> sites. The slopes on Lot 3 suggest that the proposed sites are <br /> the best sites on the property and should be preserved if at all <br /> possible. Lot 1 could be much more flexible but there is no <br /> guarantee that other locations within Lot 1 could support a <br /> standard trench system as can the tested site. <br /> One of the conditions of preliminary plat approval and final <br /> plat approval should be fencing off of the primary and alternate <br /> sites on each lot to avoid disturbance. <br /> Given the above assumptions and conditions, this appears to <br /> be a reasonable and feasible 3-lot subdivision. <br /> Summary - <br /> Lot 1 - Standard trenches both sites <br /> Lot 2 - Replace existing system <br /> - Test for a new alternate site <br /> Lot 3 - Mound required both sides <br />
The URL can be used to link to this page
Your browser does not support the video tag.