My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso #6835
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Rd
>
1400 Bracketts Point Rd - PID: 11-117-23-32-0025
>
Resolutions
>
Reso #6835
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:30:22 PM
Creation date
4/4/2018 2:54:29 PM
Metadata
Fields
Template:
Address
House Number
1400
Street Name
Bracketts Point
Street Type
Road
Address
1400 Bracketts Point Road
Document Type
Resolutions
PIN
1111723320025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> NO. 6835 <br /> HO <br /> • <br /> A. Lot lines platted per preliminary plat survey/drawing by Gronberg <br /> and Associates dated December 6, 2017 attached hereto as Exhibit <br /> B, except as modified herein. <br /> B. Dedication of "drainage and utility easements" 10' along exterior <br /> property lines and 5' along the interior property lines. <br /> C. Dedication of"Drainage Easements"over all drainageways <br /> D. Name of plat. <br /> 2). Legal documents required: <br /> A. Title opinion addressed to the City or a title insurance policy in favor <br /> of the City. All owners, mortgage holders or others with property <br /> interest indicated therein shall sign the plat and all other documents <br /> affected by such interest. <br /> B. The applicant must provide certified copies of all recorded <br /> easements currently affecting the property. <br /> C. Signed Developers Agreement and Letter of Credit for construction <br /> of improvements. The City Engineer shall establish the amount to <br /> be provided in the Letter of Credit. <br /> 3). Fees required: Application fee, Park dedication, Stormwater and Drainage Trunk <br /> enumerated above. <br /> E. Development Agreement. Development Approval is contingent upon the <br /> successful execution of a Development Agreement between the applicant and the <br /> City. Such Agreement shall address all specific City requirements for the <br /> development. <br /> F. Financial Guarantee. The Development Agreement shall include a fmancial <br /> guarantee by the applicant to ensure the completion of site improvements.The City <br /> Engineer shall complete an estimate of improvement costs, including but not <br /> limited to streets, curb & gutter, sanitary sewers, landscaping, grading, erosion <br /> control, utilities, and stormwater management facility construction, and the <br /> applicant shall provide to the City a financial guarantee of 150% of the <br /> improvement costs. <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.