Laserfiche WebLink
PLAN REVIEW CHECKLIST FOR NEW STRUCTURES / ADDITIONS <br /> Address: ,`�O 7 Fatrfripetv A /4. Permit No.: l8 ©o�Z67 <br /> Description of work: Date Rec'd: 3/ ((iB <br /> Septic review by: Date Approved: <br /> Zoning review by: Date Approved: Z t <br /> Building review by: t C/ ,-,-4->iDate Approved: ✓/2 '/i <br /> Grading review by: Date Approved: <br /> Zoning District: Zoning File#: Reso#: Reso Date: <br /> Zoning: Lot Area: SF/AC Width: Lot Coverage: SF ok <br /> Survey Submitted: 0 YesNo Date of Survey: Revised date(?): <br /> / <br /> Landscape plan submitted? 0 Yes 0 No Landscaper: <br /> Proposed Setbacks: <br /> Front(Lake) Rear(Street) ( S E W ) ( N S E ,SIV ) Other Buildings Wetland <br /> Side Side/ <br /> • <br /> Defined Height: Peak Height:`: FFE: FFE minus 6 feet= (Existing Contour) <br /> • <br /> Perimeter(linear feet) = 50% = L.F. below grade <br /> Basement? 0 Yes 0 No, Stories <br /> FOR A BUILDING WITH A BASEMENT OR CRAWL SPACE; FOR A BUILDING ON A SLAB FOUNDATION: <br /> The distance between the west pluposed Slab at or above grade— <br /> START WITH floor(of the basement or cwl space)and measure from highest existing <br /> the highest point of the root �/ START WITH grade to the highest point of the <br /> roof even if fill was brought in to <br /> If you have a... <br /> /elevate home. <br /> SUBTRACTION • GABLE OR HIPPEL ROOF(no Slab below grade—measure <br /> (BASED ON windows): Subtract halflthe distance , from highest existing grade to the <br /> ROOF TYPE) between the highest point of the roof highest point of the roof. <br /> to the low poinybf the corresponding If you have a... <br /> gable or hipp roof <br /> SUBTRACTION • GABLE OR HIPPED ROOF <br /> • GABLE OR IPPED ROOF(with (BASED ON (no windows): Subtract half <br /> windows):/Subtract half the,distance ROOF TYPE) the distance between the <br /> highest point of the roof to <br /> between&top of the highest the low point of the <br /> window nd the highest point:of the corresponding gable or <br /> roof hipped roof <br /> • ALL, THER ROOF TYPES(flat, • GABLE OR HIPPED ROOF <br /> ma/�sard,etc):No subtraction. \ (with windows): Subtract <br /> SUBTRACTION Subtragt'the distance between the half the distance between <br /> (BASED ON , baserrtent/crawl space floor and the i the top of the highest <br /> EXISTING high9tt existing grade adjacent to the window and the highest <br /> GRADES) four}dation OR 10 feet(whichever is less). point of the roof <br /> • ALL OTHER ROOF TYPES <br /> (flat,mansard,etc):No <br /> EQUALS Dined building height subtraction. <br /> Defined building height <br /> EQUALS <br /> Updated: October 2015 <br /> z:\forms\plan review checklist 10-2015.docx <br />