My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01243 - new septic
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0840 Old Crystal Bay Road South - 09-117-23-12-0002
>
Septic
>
2011-01243 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:17:56 PM
Creation date
4/2/2018 11:57:52 AM
Metadata
Fields
Template:
x Address Old
Address
0840 Old Crystal Bay Rd S
Document Type
Septic
PIN
0911723120002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pump Selection Design <br /> Minnesota Pollution UNIVERSITY <br /> Worksheet OF MINNESOTA ifilkit <br /> Control Agency <br /> 1. PUMP CAPACITY v 11.05.31 <br /> A. Pumping to Gravity or Pressure Distribution: I O Gravity C,Pressure Selection required <br /> 1. If pumping to gravity enter the gallon per minute of the pump: GPM <br /> 2. Is the pump for the treatment system or the collection system: <br /> I0 Treatment System O Collection System Selection required for worksheet to work properly <br /> 3. If pumping to a pressurized treatment system,what part or type of system: <br /> Soil Treatment Unit D Media Filter ❑Other <br /> 4. It pumping to a pressurized distnbution system: I 36.0 GPM <br /> (Line 11 of Pressure Distribution or Line 10 of Non-Level or enter if Collection System) <br /> 2. HEAD REQUIREMENTS <br /> Soil treatment systein^ <br /> 3. Elevation Difference 11 ft &pant of discharge <br /> between pump and point of discharge: <br /> S 4Mw0th <br /> NOTE:IF system is an individual subsurface sewage treatment <br /> system, complete steps 4-9. If system is a Collection System, nretpee <br /> Elevation r' <br /> skip steps 4,5, 7 and 8 and go to Step 10. 6 <br /> diNerence <br /> 4. Distribution Head Loss: 5 ft <br /> 5. Additional Head Loss: ft(due to special equipment,etc.) h,-Friction Loss in Plastic Pipe per 100 ft <br /> Distribution Head Loss (C=130) <br /> Gravity Distribution = Oft Nominal Pipe Diameter <br /> Pressure Distribution based on Minimum Average Head Flow Rate 1 11/4 114 2 3 <br /> Value on Pressure Distribution Worksheet: (GPM) <br /> 10 9.11 3.08 1.27 0.31 --- <br /> Minimum Average Head Distribution Head Loss 12 12.77 4.31 1.78 0.44 <br /> 1ft 5ft <br /> 2ft Mt 14 16.99 5.74 2.36 0.58 --- <br /> 5ft 10ft 16 --- 7.35 3.03 0.75 0.10 <br /> 18 --- 9.14 3.76 0.93 0.13 <br /> 6. A.Supply Pipe Diameter: 2.0 in 20 --- 11.11 4.58 1.13 0.16 <br /> B.Supply Pipe Length: 45 ft 25 16.79 6.92 1.71 0.24 <br /> 30 --- --- 9.69 2.39 0.33 <br /> 7. Based on Friction Loss in Plastic Pipe per 100ft from Table I: 35 --- 12.90 3.18 0.44 <br /> 40 --- --- 16.52 4.07 0.57 <br /> Friction Loss= 3.32 ft per 100ft of pipe 45 --- --- --- 6.07 0.70 <br /> 8. Determine Equivalent Pipe Length from pump discharge to soil dispersal 50 --- --- --- 6.16 0.86 <br /> area discharge point. Estimate by adding 25%to supply pipe length for 55 --- --- --- 7.35 1.02 <br /> fitting loss. Supply Pipe Length(6.8) X 1.25=Equivalent Pipe Length 60 --- --- --•- 8.63 1.20 <br /> 65 --- --- --- 10.01 1.39 <br /> 45 ft X 1.25 = 56.3 ft 70 --- --- --- 11.48 1.60 <br /> 9. Calculate Supply Friction Loss by multiplying Friction Loss Per 100ft (Line 6)by the Equivalent Pipe Length (Line 7)and divide by 100. <br /> Supply Friction Loss= <br /> 3.32 ft per 100ft X 56.3 ft ÷ 100 = 1.9 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.