My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01243 - new septic
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0840 Old Crystal Bay Road South - 09-117-23-12-0002
>
Septic
>
2011-01243 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:17:56 PM
Creation date
4/2/2018 11:57:52 AM
Metadata
Fields
Template:
x Address Old
Address
0840 Old Crystal Bay Rd S
Document Type
Septic
PIN
0911723120002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OSTP Pressure Distribution <br /> UNIVERSITY <br /> Minnesota Pollution Design Worksheet OF MINNESOTA <br /> Control Agency 1dithiii <br /> ,, <br /> 1. Select Number of Perforated Laterals in system/zone: 3 Ry s�_g� tCgz Geote3tai�le- _ ( '_�_ r+ <br /> kw Jona spiced 3'apart <br /> 72:-,r Minimum; ,.-.S►? /�•i:�_eD <br /> (2 feet is minimum and 3 feet is maximum spacing) v'k perforations spaced 3'apart q i 2"of rock c <br /> 2. Select Perforation Spacing: 3.0 ft i,.'' . 7 ,. S� ,'o- u <br /> / k►r r1►j►ia�' ► 9 ofrock�+r,► % ,. :1, "_..t-_',e..•i,j <br /> 3. Select Perforation Diameter Size 7/32 inch •r. ` ' .' "" <br /> Perforation sizing:'h"to'I4" <br /> Perforation spacing:2'to 3' <br /> 4. Length of Laterals =Media Bed Length-2 Feet. Perforation can not be closer then 1 foot from edge. v 11.05.31 <br /> 63 - 2ft = 61 ft <br /> 5- Determine the Number of Perforation Spaces. Divide the Length of Laterals (Line 4)by the Perforation Spacing (Line 2)and <br /> round down to the nearest whole number. <br /> Number of Perforation Spaces = 61 ft - 3 ft = 20 Spaces <br /> 6. Number of Perforations per Lateral is equal to 1.0 plus the Number of Perforation Spaces (Line 5). <br /> Perforations Per Lateral = 20 Spaces + 1 = 21 Perfs. Per Lateral <br /> Check table below to verify the number of perforations per lateral guarantees less than a 10%discharge variation. The value is <br /> double if the a center manifold is used. <br /> Maximum Number of Perforations Per Lateral to Guarantee<10%Discharge Variation <br /> !,Inch Perforations 7/32 Inch Perforations <br /> Perforation Spacing(Feet) Pipe Diameter(Inches) Perforation Spacing Pipe Diameter(Inches) <br /> 1 114 11/2 2 3 (Feet) I 114 11 2 3 <br /> 2 10 13 18 30 60 2 11 16 21 3.4 68 . <br /> 21 8 12 16 28 54 21/2 10 14 20 32 64 <br /> 3 8 12 16 25 52 3 9 14 19 30 60 <br /> 3.'16 inch Perforations 1/8 Inch Perforations <br /> Pipe Diameter(Inches) Perforation Spacing Pipe Diameter(Inches) <br /> Perforation Spacing(Feet) 1 114 ts: 2 3 (Feet) 1 146 1St 2 3 <br /> 2 12 18 26 46 87 2 21 33 44 74 149 <br /> 21/2 12 17 24 40 80 21/2 20 30 41 69 135 <br /> 3 12 16 22 37 75 3 20 29 38 64 128 <br /> 7. Total Number of Perforations equals the Number of Perforations per Lateral (Line 6)multiplied by the Number of <br /> Perforated Laterals (Line 1). <br /> 21 Perf. Per Lateral X 3 Number of Perf. Laterals = 63 Total Number of Perf. <br /> 8. Calculate the Square Feet per Perforation. Recommended value is 4-10 ft2 per perforation. Perforation Dieehar$e(OM <br /> Perforation DiameterDoes not apply to At-Grades Head(rt) <br /> Bed Area = Bed Width(ft)X Bed Length(ft) <br /> tie 0.1e 0.41 0.56 0.74 <br /> 1.5 0,22 0.51 0.69 0.9 <br /> 10 ft x 63 ft = 630 ft2 2.0• 0.26 0.59 0.80 1.04 <br /> 2,5 0.29 0.65 0.89 1.17 <br /> 3.0 0.32 0.72 0.98 1.28 <br /> Square Foot per Perforation =Bed Area divided by the Total Number of Perforations (Line 7). 4.0 0.37 0.53 1.13 1.47 <br /> 5.0` 0.41 0.93 1.26 1.65 <br /> Dwellings with 3/16 inch to 1/4 inch <br /> 630 ft2 63 perforations = 10.0 ft2/perforations "°°t <br /> perforatkms90'4 <br /> Dwellings with l/a Inch perforations <br /> 2 feet Other establishments and+11515 with 3/16 <br /> 9. Select Minimum Average Head: 1.0 ft inch to f/4 inch perforations <br /> !Other establishments and M5T5 with 1/8 inch <br /> 5 feet f„forations <br /> 10. Select Perforation Discharge (GPM)based on Table III: 0.56 GPM per Perforation <br /> 11. Determine required Flow Rate by multiplying the Total Number of Perforations (Line 7)by the Perforation Discharge (Line 10). <br /> 63 Perforations X 0.56 GPM per Perforation = 36 GPM <br />
The URL can be used to link to this page
Your browser does not support the video tag.