Laserfiche WebLink
• <br /> Christine Mattson <br /> From: Christine Mattson <br /> Sent: Thursday, May 17, 2012 9:33 AM <br /> To: 'jsonnek@charlescudd.com' <br /> Subject: 840 Old Crystal Bay Road South / Bldg Permit#2011-01003 <br /> Attachments: admin@ci.orono.mn.us_20120517_092012.pdf <br /> Hi John, <br /> According to City Code Section 86-68(3) an as-built survey is required before a certificate of occupancy will be <br /> issued, see below. <br /> Sec. 86-68. Permit application; information required. <br /> (a) The application for a construction permit shall include such information as may be required by the city, <br /> which may vary between types of construction projects. <br /> (b) Surveys required: <br /> (1) Initial survey.Any building or general permit application for construction of a new structure or <br /> expansion of an existing structure shall be accompanied by a certificate of survey prepared by a <br /> Minnesota Registered Land Surveyor unless the building official determines the construction <br /> project is exempt from this section.The certificate of survey shall conform to the standards on <br /> file in the office of the building official. <br /> (2) Foundation survey.A foundation survey shall be submitted to the city for review and approval, <br /> unless exempted by the building official, upon completion of the foundation work for all <br /> buildings and all additions to buildings.The foundation survey, prepared by a Minnesota <br /> Registered Land Surveyor,shall certify the lot dimensions;front, side, rear, lakeshore, and <br /> wetland setbacks; and foundation elevation.A foundation survey must be submitted before <br /> proceeding with framing or further construction. In lieu of a survey a letter prepared by a <br /> Minnesota Registered Land Surveyor containing the same information as a foundation survey <br /> may be submitted. <br /> (3) As-built survey.An as-built survey, prepared by a Minnesota Registered Land Surveyor, shall be <br /> submitted to the city for review and approval upon the completion of all buildings and all <br /> additions to buildings, unless exempted by the building official.The as-built survey shall certify <br /> the final topography of the site;verify drainage patterns; and provide hardcover calculations for <br /> lots in the Shoreland Overlay District.An as-built survey must be approved before the issuance <br /> of a certificate of occupancy. In the event that weather or other conditions prevent the <br /> completion of an as-built survey at the time the Certificate of Occupancy is requested, applicant <br /> shall provide a sufficient financial guarantee and establish an escrow agreement to ensure <br /> completion of the as-built survey. <br /> (Code 1984, § 12.02; Ord. No.49 3rd series, § 1, 9-8-2008) <br /> I have also attached a copy of the fee schedule which shows temporary certificate of occupancies are issued <br /> during winter conditions. Finally, also attached is a copy of the building permit, initialed by JL acknowledging <br /> the requirements needed before a final certificate of occupancy would be issued. <br /> Please don't hesitate to contact me if you have any questions. <br /> Christine Mattson <br /> Planning Assistant <br /> City of Orono <br /> 1 <br />