My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01003 - new structure
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0840 Old Crystal Bay Road South - 09-117-23-12-0002
>
Permits/Inspections
>
2011-01003 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:17:56 PM
Creation date
4/2/2018 11:57:40 AM
Metadata
Fields
Template:
x Address Old
Address
0840 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0911723120002
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2335 Highway 36 W <br /> St. Paul,MN 55113 <br /> Tel 651-636-4600 <br /> Fax 651-636-1311 <br /> www.bonestroo.com <br /> September 21, 2011 Bonestroo <br /> Melanie Curtis <br /> Planning and Zoning Coordinator <br /> City of Orono <br /> Post Office Box 66 <br /> Crystal Bay, MN 55323 <br /> Re: 840 Old Crystal Bay Road <br /> File No. 000139-11000-1 <br /> File No. 2011-01003 <br /> Dear Melanie: <br /> We have reviewed the plans for the proposed new home construction at 840 Old Crystal Bay <br /> Road. The plans are dated 9-9-11. We have the following comments with regards to <br /> engineering matters: <br /> • The proposed retaining wall is shown as 4.0 feet in height. If field changes increase the <br /> height, engineering design and details must be submitted for review. <br /> • Stormwater runoff must be managed along the south lot line. The proposed conditions <br /> can not increase the amount of runoff to the neighboring property. A revised grading <br /> plan should be required. <br /> • The submitted wetland delineation was not approved by the watershed due its winter <br /> submittal timeframe. A watershed approved wetland delineation must be submitted to <br /> determine the city's wetland buffers and associated easements required on this site. <br /> • This project will disturb more than 100 CY of material. Sediment and erosion control <br /> information meeting the requirements of Orono's City Code 79-7(c)(2) must be <br /> submitted. The minimum $2000 sediment and erosion control financial security should <br /> be required of the owner for this permit. <br /> If you have any questions, please call me at (651) 604-4894 or send an email to <br /> darren.a mundsenCal bonestroo.com. <br /> Sincerely, <br /> BONESTROO <br /> Darren Amundsen <br /> cc: Chris Mattson <br />
The URL can be used to link to this page
Your browser does not support the video tag.