Laserfiche WebLink
Q� CITY OF ORONO <br /> /011) <br /> O SEPTIC SYSTEM APPROVAL <br /> ; . CITY of ORONO <br /> A ws,./,,- �+ IMunicipai Oitices <br /> `►�,' � t r � Past Office Box 66 . <br /> �' � 1�( 1� 1/2G Crystal Bay,Minnesota 553230066 <br /> kESH04 <br /> - LOCATION: 825 Old Crystal Bay Rd. S. <br /> Judson Dayton <br /> OWNER: <br /> GENERAL CONTRACTOR: SEPTIC CONTRACTOR: Sullivan' s <br /> SITE EVALUATOR: S-P Testing REPORT DATE: June 15, 1994 <br /> The City of Orono has Approved your on-site system design as of A„g„ f 99, 1Q1:44 <br /> (approved-disapproved) (date) <br /> with the following comments: Site must be staked to verify excavated soils <br /> before rough-up is performed. <br /> THIS IS NOT A PERMIT. This is a design approval form which must accompany the site plan. A permit must <br /> be issued to a licensed septic contractor prior to installation. A list of currently licensed septic contractors is <br /> enclosed. <br /> NOTICE TO INSTALLERS: Any changes to the approved plans and specs must have prior approval of the <br /> Inspector (473-7357). Call for inspections 24 hours in advance. <br /> ALL DRAINFIELD AREAS MUST BE FENCED OFF prior to building site excavation and fencing must remain <br /> in place until final site grading. Approval to pour footings will not be granted until the Inspections Department <br /> has verified that primary and alternate sites are adequately protected. <br /> NO VEHICULAR TRAFFIC OF ANY KIND (cars, trucks, earth moving equipment, etc.) is allowed within 20' <br /> of tested drainfield sites either before or after system construction. Compaction of these areas could render them <br /> unusable prohibiting the timely completion and or limiting the long term use of the property. <br /> A site copy will be available at the City Offices for the septic contractor. <br /> CITY OF ORONO <br /> By '/� <br /> Stephe eckman, On-site Systems Manager <br /> TELEPHONE-473-7357•FAX-473-0510 <br />