My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic info
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0790 Old Crystal Bay Road South - 04-117-23-43-0007
>
Septic
>
septic info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:30 PM
Creation date
3/27/2018 12:05:54 PM
Metadata
Fields
Template:
x Address Old
Address
0790 Old Crystal Bay Rd S
Document Type
Septic
PIN
0411723430007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, 014:::. °411.--- 10 . • <br /> I 4,---4.„z:::,,.,.. CITY of ORONO <br /> l "'. et' <br /> Municipal Offices <br /> tr a ..;.,, <br /> ;,g�i Street Address: Mailing Address: <br /> `GESSO 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> Owner: Ac-i-I‘vr Bicl',c <br /> Address: ?9 0 0 IJ CrySlql 8ay )(, $. <br /> City Ordinance 199 requires that each existing on-site sewage treatment system in Orono be inspected every two years. <br /> The on-site sewage treatment system at the above address has been inspected and appears to fall into the categories checked below. <br /> SYSTEM CONFORMITY (1-3): <br /> 1 "CODE SYSTEM" An ISTS which meets all the location,design and construction standards of the current Orono Municipal Code. <br /> 2 "COMPLIANT SYSTEM" An ISTS which does not meet all the location,design and construction standards of the current Orono Municipal <br /> Code but does meet the three foot separation requirement,and which is not failing or an imminent threat to public health or safety. <br /> 3 "NON-COMPLIANT SYSTEM" A prohibited ISTS;an ISTS located within a designated 100-year flood plain,any ISTS which may <br /> �J or may not meet all the location,design,or construction standards of the current Orono Municipal Code and which is failing for any reason;and <br /> any ISTS with less than three feet of unsaturated soil or sand between the distribution device and the limiting soil characteristics. <br /> - <br /> TANK CONDITION(5-10): 6 . <br /> Tank inspection indicates: .. <br /> 5 Pumpout not needed at this time. <br /> V Tank must be pumped out this year (city code requires tanks to be pumped out every 3 years. Tank was last pumped Li-I 4 <br /> 7 Solids accumulation in tanks is at a critical a critical leveL Tanks should be pumped out as soon as possible. ) <br /> 8 System is discharging to the surface. Tanks must be pumped out within 48 hours to eliminate surface discharge. <br /> 9 Inspection risers missing-tanks could not be inspected. Inspection risers(4"dia.pipe)must be installed in each tank at next pumpout If tanks <br /> have not been pumped out within the last three years,they should be pumped out now. <br /> 10 Inspection pipe is located directly over tank baffle(does not give accurate measurement of solids accumulation). If tanks have not been pumped <br /> out within the last three years,they should be pumped out now. <br /> D' • IELD CONDITION(11-14): 1 I . <br /> 6. •Drainfield is dry,no surfacing evident. <br /> 12 Some evidence of surfacing,not critical yet. • <br /> 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact the City Inspector immediately.Repairs must be <br /> completed within 90 days. <br /> 14 Drainfield extent and condition unknown. <br /> COMMENTS: N/S n, i s n o n- (6 n•P 1:-gr,-)- Jut i-o 19 ck. 0i 3 -loot -syf ro-;O r, <br /> bei-weer. 't e 01- S elsor\ itr•iALk- gr, o-1-►c,.. v-f- -reNc,�.eS. Real ma. b 1 1_-ol o. <br /> h'a's-b 1 /�' <br /> Date of Inspection +i <br /> Septic System Inspector <br /> Note: In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property,be advised that this report does not guarantee <br /> or certify that an existing system will continue to function properly,but is merely an opinion of the adequacy of the system under current conditions based on the available <br /> information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.