My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01006 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0540 Old Crystal Bay Road South - 04-117-23-42-0030 - New PID
>
Permits/Inspections
>
2016-01006 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:27 PM
Creation date
3/26/2018 3:17:02 PM
Metadata
Fields
Template:
x Address Old
Address
0540 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723420030
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lindstrom gleaning& Construction,Inc <br /> 9621 10th Avee North <br /> Plymouth,Mn.55441-5098 <br /> 763-544-8761 <br /> Fed TIN 41-0847540 <br /> Recap by Category with Depreciation <br /> O&P Items I RCV Deprec. ACV <br /> APPLIANCES 19.47 19.47 <br /> Coverage:Dwelling @ 100.00% = 19.47 <br /> CABINETRY 611.45 611.45 <br /> Coverage:Dwelling @ 100.00% = 611.45 <br /> CLEANING 240.92 240.92 <br /> Coverage:Dwelling I @ 100.00% = 240.92 <br /> CONTENT MANIPULATION 921.84 921.84 <br /> Coverage:Dwelling @ 100.00% = 921.84 <br /> GENERAL DEMOLITION I 510.13 510.13 <br /> Coverage:Dwelling j @ 100.00% = 510.13 <br /> DOORS 734.47 734.47 <br /> Coverage:Dwelling @ 100.00% = 734.47 <br /> DRYWALL 1 2,670.03 2,670.03 <br /> Coverage:Dwelling @ 100.00% = 2,670.03 <br /> ELECTRICAL 3,914.04 3,835.00 79.04 <br /> Coverage:Dwelling I@ 2.02% = 79.04 <br /> Coverage:Code Compliance @ 97.98% = 3,835.00 <br /> FLOOR COVERING-RESILIENT 2,441.35 2,441.35 <br /> Coverage:Dwelling @ 100.00% = 2,441.35 <br /> FLOOR COVERING-WOOD 1,075.83 1,075.83 <br /> Coverage:Dwelling 1 @ 100.00% = 1,075.83 <br /> FINISH CARPENTRY/TRIMWORK 1,608.88 1,608.88 <br /> Coverage:Dwelling @ 100.00% = 1,608.88 <br /> FRAMING&ROUGH CARPENTRY 908.84 908.84 <br /> Coverage:Dwelling @ 100.00% = 908.84 <br /> HAZARDOUS MATERIAL REMEDIATION 159.36 159.36 <br /> Coverage:Dwelling @ 100.00% = 159.36 <br /> HEAT, VENT&AIR CONDIT>(ONING 3,910.00 3,910.00 0.00 <br /> Coverage:Code Compliance @ 100.00% = 3,910.00 <br /> INSULATION 504.87 504.87 <br /> Coverage:Dwelling @ 100.00% = 504.87 <br /> LIGHT FIXTURES 100.30 100.30 <br /> Coverage:Dwelling I @ 100.00% = 100.30 <br /> MARBLE-CULTURED OR NATURAL 60.63 60.63 <br /> Coverage:Dwelling @ 100.00% = 60.63 <br /> PLUMBING 3,238.00 3,238.00 0.00 <br /> Coverage:Code Compliance @ 100.00% = 3,238.00 <br /> PAINTING 3,574.02 3,574.02 <br /> Coverage:Dwelling @ 100.00% = 3,574.02 <br /> WINDOW TREATMENT 65.62 65.62 <br /> Coverage:Dwelling @ 100.00% = 65.62 <br /> JUDY_&_GEORGE_REVISE 8/11/2016 Page:20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.