My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-00575 - new septic
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0535 Old Crystal Bay Road South- 04-117-23-31-0004
>
Septic
>
2014-00575 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:11 PM
Creation date
3/26/2018 1:55:15 PM
Metadata
Fields
Template:
x Address Old
Address
0535 Old Crystal Bay Rd S
Document Type
Septic
PIN
0411723310004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The existing tanks will need to be abandoned, pumped &filled with soil &a tank <br /> abandonment report completed. <br /> The first tank will be a 1500 gallon.dual chamber tanks reversed using the 500 gallon <br /> side as the trash trap &the 1000 gallon side as a dosing chamber(pump#1)which <br /> will dose 12.5 gallons every 30 minutes with a timer to the Multi-Flo Unit. The <br /> effluent will flow g vity from the Multi-Flo to a new 1500 gallon pumping chamber <br /> (pump#2)which 11 pressurized the seepage bed. The power supply&switches <br /> must be located ositside the manhole & pumping chamber in a weather proof <br /> enclosure. A wardevice must be installed with a light&sound device. This is <br /> in case of a pump failure. <br /> Monitoring of the dlainfleld, is required immediately after the system is installed. <br /> See the monitoring contract for the price. <br /> if the tanks have leas than 2'of cover,the lids, risers& maintenance hole covers <br /> must be insulated tlo a value of R10. <br /> Cieanouts for each lateral must be insulated & be accessible from finished grade in <br /> an irrigation box with a ball valve. <br /> A water meter or e â–ºent counter must be installed to monitor daily water use. The <br /> homeowner is responsible for the water meter readings. <br /> The mitigation plan)is if hydraulic overloading would occur, a timer could be installed <br /> to reduce the amount of effluent pumped to the system and also by using the 1500 <br /> gallon pumping chamber allows the effluent to be stored during peak use and <br /> pumped to the systm during low water use periods. The second would be to install <br /> holding tanks. <br /> All neighboring wells are located greater than 100'away from the proposed <br /> treatment area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.