Laserfiche WebLink
Note: Asan option, PRI will provide a follow-up consultation approximately 1 month after the <br /> completion of the project(if the project was seeded in the fall,the consultation will occur the following <br /> spring). The Restorationist(or salesperson)will meet with the project owner to assess the status of the <br /> project,answer any questions,and provide any necessary recommendations. This follow-up <br /> consultation will be provided at no additional cost. <br /> J. Contract: <br /> If you accept the proposal as written and want to proceed with the project, please <br /> sign the cpntract below. <br /> Property Owner: Date: <br /> Contractdr: Prairie Restorations, Inc. <br /> By: Date: <br /> A 20%dov+rn payment is required at this time. Please return a copy of the signed <br /> contract, along with payment for 20%of the total project cost. Thank you. <br /> Josh Pomrmier—Restorationist <br /> Prairie Res orations, Inc. <br /> P.O. Box 1 .27 <br /> Watertown, MN 55388 <br /> K. Notes: Pleb se note that this proposal is valid for 4 months (from the date on the <br /> proposal). Ilf the proposal is accepted after the 4 month period, PRI reserves the right <br /> to modify tie proposal based on cost fluctuations and material availability. <br /> Restoration outlirhe prepared by Prairie Restorations,Inc.(PRI),Princeton,Minnesota <br /> .pro <br /> 7 <br />