My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-01295 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road South
>
0505 Old Crystal Bay Road South - 04-117-23-31-0003
>
Permits/Inspections
>
2011-01295 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:10 PM
Creation date
3/23/2018 3:07:45 PM
Metadata
Fields
Template:
x Address Old
Address
0505 Old Crystal Bay Rd S
Document Type
Permits/Inspections
PIN
0411723310003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Note: Asan option, PRI will provide a follow-up consultation approximately 1 month after the <br /> completion of the project(if the project was seeded in the fall,the consultation will occur the following <br /> spring). The Restorationist(or salesperson)will meet with the project owner to assess the status of the <br /> project,answer any questions,and provide any necessary recommendations. This follow-up <br /> consultation will be provided at no additional cost. <br /> J. Contract: <br /> If you accept the proposal as written and want to proceed with the project, please <br /> sign the cpntract below. <br /> Property Owner: Date: <br /> Contractdr: Prairie Restorations, Inc. <br /> By: Date: <br /> A 20%dov+rn payment is required at this time. Please return a copy of the signed <br /> contract, along with payment for 20%of the total project cost. Thank you. <br /> Josh Pomrmier—Restorationist <br /> Prairie Res orations, Inc. <br /> P.O. Box 1 .27 <br /> Watertown, MN 55388 <br /> K. Notes: Pleb se note that this proposal is valid for 4 months (from the date on the <br /> proposal). Ilf the proposal is accepted after the 4 month period, PRI reserves the right <br /> to modify tie proposal based on cost fluctuations and material availability. <br /> Restoration outlirhe prepared by Prairie Restorations,Inc.(PRI),Princeton,Minnesota <br /> .pro <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.